Business

Vanguard Mining Reports 2025 Redonda Drill Results; Cross-Section Confirms Copper-Molybdenum System More Than Doubles in Size

Vancouver, BC – TheNewswire - January 23, 2026 – Vanguard Mining Corp. ("Vanguard" or the "Company") (CSE: UUU | OTC: UUUFF | Frankfurt: SL51) is pleased to ann

articleUranium One Mining Corp.January 23, 20265/company/vanguard-mining-corp/news/vanguard-mining-reports-2025-redonda-drill-results-cross-section-confirms-copper-molybdenum-system-more-than-doubles-in-size
Vanguard Mining Reports 2025 Redonda Drill Results; Cross-Section Confirms Copper-Molybdenum System More Than Doubles in Size

About this update from Uranium One Mining Corp.

[{"type":"text","content":"Vancouver, BC – TheNewswire - January 23, 2026 – Vanguard Mining Corp. (\"Vanguard\" or the \"Company\") (CSE: UUU | OTC: UUUFF | Frankfurt: SL51) is pleased to announce assay results from its recently completed Phase 1 of its 2025 diamond drilling program, which included Holes 25-01 and 25-02 at its 100%-owned Redonda Copper-Molybdenum Project (the “Project”), located in the Vancouver Mining Division, approximately 40 kilometres northeast of Campbell River, British Columbia. 2025 Drill Results Highlight System Growth Hole 25-01, drilled at a dip of -65°, intersected extensive copper-molybdenum mineralization over much of its length: From 3.05 m to 29.12 m (27.07 m), a weighted average of 0.3252% copper and 78 ppm molybdenum  From 37.65 m to 387.70 m (350.05 m), a weighted average of 0.244% copper and 112 ppm molybdenum  These intercepts extend the higher-grade mineralized zone by an additional 199.05 metres, more than doubling the length of higher-grade mineralization intersected in the 2023 drilling in cross-section. Hole 25-01 reached a total depth of 510.74 metres and returned a weighted average grade of 0.1801% copper and 86 ppm molybdenum over its entire length. Lower-grade mineralization continues beyond the end of the hole, indicating the system remains open at depth. Hole 25-02, drilled vertically and located approximately 30 metres east of the 2023 drilling, intersected: From 3.05 m to 132.00 m (129.26 m), a weighted average of 0.1344% copper and 128 ppm molybdenum  Together, these results demonstrate that copper-molybdenum mineralization at Redonda is laterally and vertically extensive in cross-section. A valid drill permit is currently in place, allowing for continued drilling at the Project during the 2026 exploration season. Table 1: Summary of 2025 Redonda Drill Results Hole ID Dip From (m) To (m) Interval (m) Cu (%) Mo (ppm) 25-01 -65° 3.05 29.12 27.07 0.3252 78 25-01 -65° 37.65 387.70 350.05 0.2440 112 25-01 -65° 0.00 510.74 510.74 0.1801 86 25-02 Vertical 3.05 132.00 129.26 0.1344 128 Reported intervals are downhole lengths; true widths have not yet been determined. Samples were submitted to ALS Canada Ltd. (“ALS Laboratories”) for geochemical analysis. Industry-standard quality assurance and quality control protocols were employed, including the insertion of certified reference materials and bla...

More updates from Uranium One Mining Corp.