Business

Vanguard Mining Engages Hardline Exploration for NI 43-101 Technical Report Update at Brussels Creek Gold-Copper-Palladium Project, Kamloops, BC

Vancouver, BC – TheNewswire - December 19, 2025 – Vanguard Mining Corp. ("Vanguard" or the "Company") (CSE: UUU | OTCID: UUUFF | FSE: SL51) is pleased to announ

articleUranium One Mining Corp.December 19, 20254/company/vanguard-mining-corp/news/vanguard-mining-engages-hardline-exploration-for-ni-43-101-technical-report-update-at-brussels-creek-gold-copper-palladium-project-kamloops-bc
Vanguard Mining Engages Hardline Exploration for NI 43-101 Technical Report Update at Brussels Creek Gold-Copper-Palladium Project, Kamloops, BC

About this update from Uranium One Mining Corp.

[{"type":"text","content":"Vancouver, BC – TheNewswire - December 19, 2025 – Vanguard Mining Corp. (\"Vanguard\" or the \"Company\") (CSE: UUU | OTCID: UUUFF | FSE: SL51) is pleased to announce that it has retained Hardline Exploration Ltd. (“Hardline”), a respected independent geological consulting firm, to complete an NI 43-101 Technical Report for its 100%-owned Brussels Creek Gold-Copper-Palladium Project (“Brussels Creek”), located in the highly prospective Kamloops Mining District of British Columbia. As previously announced in the Company’s November 26, 2025, news release, the Company recently completed a comprehensive surface sampling program at the Brussels Creek Project. Subject to the receipt of pending assay results from this program, the NI 43-101 Technical Report is expected to be completed before the end of January 2026, representing a near-term technical milestone as the Company advances Brussels Creek toward its next phase of exploration. David Greenway, President and CEO of Vanguard Mining, commented: “The near-surface gold intercept reported in 2023 delivered a compelling proof-of-concept for the Brussels Creek Project. Our recent rock and soil sampling program rock and soil sampling program is focused on refining geological vectors and identifying additional high-priority drill targets within this gold-copper-palladium system. The results will directly support the advancement of an updated NI 43-101 Technical Report, representing an important step in de-risking and systematically advancing this highly prospective project. We look forward to receiving the assay results as we continue to unlock the exploration potential at Brussels Creek.” Sampling Program Completed The 2025 program, previously announced on June 10, 2025, was designed to follow up on a near-surface drill intercept of 5.08 g/tonne gold from 25.75m to 29.25m (3.5m) reported in 2023 https://webfiles.thecse.com/Recharge.News_Release_re_New_Gold_Zone_June_6_2023.pdf?ZBPrNnpriEbaccr6lgHoI.NzRB._cs4h] and focused on systematic surface sampling to refine priority targets for follow-up drilling. The work comprised 21 rock samples, collected from surface mineralized zones, structural features, and altered host rocks (Figure 1), and 127 soil samples, collected in systematic grids to define geochemical anomalies and extensions to known mineralized trends. The sampling program was un...

More updates from Uranium One Mining Corp.