Business

Vanguard Mining Completes Drill Program With Assays Now Pending at Redonda Copper-Molybdenum Project, British Columbia

Vancouver, BC – January 9, 2026 – TheNewswire - Vanguard Mining Corp. ("Vanguard" or the "Company") (CSE: UUU | OTC: UUUFF | Frankfurt: SL51) is pleased to anno

articleUranium One Mining Corp.January 9, 20264/company/vanguard-mining-corp/news/vanguard-mining-completes-drill-program-with-assays-now-pending-at-redonda-copper-molybdenum-project-british-columbia
Vanguard Mining Completes Drill Program With Assays Now Pending at Redonda Copper-Molybdenum Project, British Columbia

About this update from Uranium One Mining Corp.

[{"type":"text","content":"Vancouver, BC – January 9, 2026 – TheNewswire - Vanguard Mining Corp. (\"Vanguard\" or the \"Company\") (CSE: UUU | OTC: UUUFF | Frankfurt: SL51) is pleased to announce it has completed its Q4 drill program drilling to a total depth of 511 metres at its 100%-owned Redonda Copper-Molybdenum Project (the “Project”), located in the Vancouver Mining Division near Campbell River, British Columbia. To execute the program, Vanguard engaged Paradigm Drilling Ltd. (“Paradigm Drilling”), which will deploy a Boyles T-75 hydraulic, track-mounted diamond drill equipped with NQ tooling and capable of testing targets to depths exceeding 600 metres. Figure 1: Typical high-grade Molybdenite (M0S2) florets-tourmaline on fracture Figure 2 Typical Abundant Chalcopyrite Fracture         Figure 3:. Typical Abundant Chalcopyrite Fracture   The Project was previously explored by Teck Resources Ltd. (formerly Teck Corp.), which completed nine NQ-diameter diamond drill holes totaling 1,681 metres in 1979. More recent follow-up drilling was completed in 2023, consisting of five drill holes totaling 799.81 metres. Historical drilling encountered copper-molybdenum mineralization; however, the historical results referenced herein in part are historical in nature. The Company has not independently verified these results and is not treating them as current mineral resources or mineral reserves as defined under National Instrument 43-101. Table 1: 2023 Exploration Program 2023 Exploration Program Hole # From / To Core Length Cu % Mo % Re (ppm) Hole Red-23-04 – Mineralization starts from surface 3.1 – 18.2 m 15.2 m 0.452 0.0265 0.1053 Hole Red-23-04 25.5 – 97.5 m 72.0 m 0.235 0.0228 0.1106 Hole Red-23-04 – Hole bottoms in good grade 147.8 – 163.1 m 30.3 m 0.212 0.0154 0.0514 Hole Red-23-03 – Mineralization starts from surface 3.1 – 48.0 m 45.0 m 0.329 0.0265 0.1111 Hole Red-23-03 68.8 – 141.0 m 77.3 m 0.323 0.0197 0.0791 Hole Red-23-03 – Hole bottoms in good grade 199.5 – 210.0 m 10.5 m 0.174 0.0117 0.0563 Hole Red-23-05 – Mineralization starts from surface 2.7 – 33.0 m 30.3 m 0.213 0.0192 0.0749 Hole Red-23-05 – Hole bottoms in good grade 39.3 – 182.0 m 142.6 m 0.279 0.0281 0.0927 Hole Red-23-02 – Mineralization starts from surface 3.1 – 111.0 m 108.0 m 0.251 0.0250 0.1025 Hole Red-23-02 – Hole bottoms in good grade 158.5 – 169.2 m...

More updates from Uranium One Mining Corp.