Business

United Lithium to Host Webinar November 29th, 2023 Focused on Recent Lithium-Pegmatite Discoveries and Drill Results at the Bergy Project, Sweden

VANCOUVER, British Columbia, Nov. 27, 2023 (GLOBE NEWSWIRE) -- United Lithium Corp. (“United” or the “Company”) (CSE: ULTH; OTC: ULTHF; FWB: 0ULA) is pleased to

articleUnited Lithium CorpNovember 27, 20235/company/united-lithium-corp/news/united-lithium-to-host-webinar-november-29th-2023-focused-on-recent-lithium-pegmatite-discoveries-and-drill-results-at-the-bergy-project-sweden
United Lithium to Host Webinar November 29th, 2023 Focused on Recent Lithium-Pegmatite Discoveries and Drill Results at the Bergy Project, Sweden

About this update from United Lithium Corp

[{"type":"text","content":" VANCOUVER, British Columbia, Nov. 27, 2023 (GLOBE NEWSWIRE) -- United Lithium Corp. (“United” or the “Company”) (CSE: ULTH; OTC: ULTHF; FWB: 0ULA) is pleased to invite all shareholders and interested parties to a webinar on Wednesday, November 29th, 2023, at 1:15 pm PST. President and CEO Scott Eldridge, and Executive Vice President, Exploration Cathy Fitzgerald, will facilitate the webinar. The webinar will focus on the Bergby Project (“Bergby”) lithium-pegmatite discoveries and the latest drilling results, announced November 21, 2023. After the presentation, the webinar will be open to pre-submitted and live-chat questions. A recorded version of this webinar will be available at https://unitedlithium.com by December 6th, 2023. Interested parties are invited to submit their questions to [email protected]. Register Here Highlights: Prospecting and subsequent drilling during 2023 have discovered three new high-grade spodumene-bearing pegmatite bodies: Pegmatites “D” and “E,” which are currently being drilled, and Pegmatite “F” that has yet to be drilled. The 2023 Drill Program is ongoing, with further results pending, and has been expanded from 4,000 metres (“m”) to 6,000 m due to the encouraging results. Five spodumene-bearing pegmatites drill-confirmed at Bergby to date, with a collective strike length of 4,000 m and thickness up to 24 m; Drilling assay results for Pegmatite D include: 1.92% Li2O over 26.80 m from 3.60 m depth down hole (hole BBY23132); 1.54% Li2O over 28.01 m from 9.12 m depth down hole (hole BBY23135); 1.82% Li2O over 12.97 m from 14.05 m depth down hole (hole BBY23138); and 1.96% Li2O over 9.68 m from 38.87 m depth down hole (hole BBY23141). Newly identified pegmatite outcrops and several unsourced spodumene-bearing pegmatite boulder trains remain to be further explored, and Much of the district-scale project is yet to be explored. Qualified Person The scientific and technical data contained in the webinar was reviewed and approved by Cathy Fitzgerald, M.Sc., P.Geo., United’s Executive Vice President, Exploration and Director. Ms. Fitzgerald is a registered professional geologist in British Columbia and a Qualified Person as defined by NI 43-101 Standards of Disclosure for Minerals Projects. Ms. Fitzgerald is not independent of the Company. On Behalf of The Board of Directors “Scott Eldridge”President,...

More updates from United Lithium Corp