Business

United Lithium Corp. Discovers Multiple Lithium Rich Boulder Trains at Bergby – Assays up to 3.33 Li2O

Recent boulder sampling has discovered multiple new lithium-bearing boulder trains that are not related to previously drilled lithium-bearing pegmatites. A pote

articleUnited Lithium CorpSeptember 30, 20215/company/united-lithium-corp/news/united-lithium-corp-discovers-multiple-lithium-rich-boulder-trains-at-bergby-assays-up-to-333-li2o
United Lithium Corp. Discovers Multiple Lithium Rich Boulder Trains at Bergby – Assays up to 3.33 Li2O

About this update from United Lithium Corp

[{"type":"text","content":" Recent boulder sampling has discovered multiple new lithium-bearing boulder trains that are not related to previously drilled lithium-bearing pegmatites. A potential source to the north and to the west of the drilled pegmatite is suggested, where sampling and mapping continues Soil sampling has commenced, and first batch of samples have been sent for assay Core Drilling underway – expected to continue until year end Additional Claims added – now more than 10,458 hectares at Berby The Swedish Prime Minister Stefan Löfven stated \"Sweden needs more mines to cope with climate change\" VANCOUVER, British Columbia, Sept. 30, 2021 (GLOBE NEWSWIRE) -- United Lithium Corp. (CSE: ULTH; OTC: ULTHF; FWB: 0ULA) (“ULTH” or the “Company”) is pleased to announce the first results from ongoing boulder train mapping and sampling at the Bergby Lithium Project in central Sweden. Excellent results have been returned from an area west of the northern end of the previously drilled lithium mineralized pegmatite. These new boulder trains are not related to drilled mineralization and are believed related to new lithium mineralized bodies. These results include 3.01% Li2O, 2.82% Li2O and 2.12% Li2O (see Table 1 and Figures 1 and 2). 300m to 500m northwest of the southwestern end of the previously drilled lithium mineralized pegmatite, values returned include 1,71% Li2O, 1.72% Li2O, and 1.46% Li2O (see Table 1 and Figures 1 and 3). And 600m west of the previously drilled southwestern end of the previously drilled lithium mineralized pegmatite, values returned include 3.33% Li2O (see Table 1 and Figures 1 and 3). The success of this boulder sampling program has encouraged United Lithium to expand the mapping and sampling program. Additional boulder samples have been sent for analysis to ALS Limited and field work is on-going. Furthermore, a soil sampling program has been completed in the vicinity of the interpreted source of the northern spodumene boulder train. Samples were dried and sieved with -63 m fraction sent to ALS Limited for analysis including Li-Ta-Cs-Rb. “Recent mapping and sampling has greatly expanded the footprint of lithium mineralized pegmatite at our Bergby Project” states Michael Dehn, President and CEO. “An extensive area has been identified with spodumene bearing boulders, and we see significant potential to find multiple lithium bear...

More updates from United Lithium Corp