Business

Results of Wressle Downhole Pressure Analysis

Results of Wressle Downhole Pressure Analysis.

articleUnion Jack Oil PlcJanuary 19, 20223/company/union-jack-oil-plc/news/results-of-wressle-downhole-pressure-analysis
Results of Wressle Downhole Pressure Analysis

About this update from Union Jack Oil Plc

[{"type":"text","content":"\n \n \n \n RNS Number : 8664Y\n Union Jack Oil PLC\n 19 January 2022\n  \n \n \n \n  \n \n \n This announcement contains inside information for the purposes of Article 7 of the Market Abuse Regulation (EU) 596/2014 as it forms part of UK domestic law by virtue of the European Union (Withdrawal) Act 2018 (\"MAR\"), and is disclosed in accordance with the Company's obligations under Article 17 of MAR.\n \n  \n 19 January 2022\n Union Jack Oil plc\n (\"Union Jack\" or the \"Company\")\n Results of Wressle Downhole Pressure Analysis\n \n  \n \n Union Jack Oil plc (AIM: UJO) a UK focused onshore hydrocarbon production, development and exploration company, is pleased to provide a summary of the results of an analysis of the bottom hole pressure data acquired from the Wressle-1 well during December 2021.  The interpretation was  completed by ERCE, an independent energy consultancy, on behalf of the Wressle Joint Venture partners.\n  \n Union Jack holds a 40% economic interest in the Wressle development.\n  \n  \n Highlights\n  \n \n · \n Results demonstrate the significant potential of the Wressle-1 well and the production rates that could be achieved once the surface facilities are optimised and a gas monetisation scheme is in place \n \n \n  \n \n \n · \n Based on the current reservoir pressure and a flowing tubing head pressure of 400 pounds per square inch gauge (\"psig\"), ERCE estimates that a rate of 1,216 barrels of oil per day (\"bopd\") would be possible, whilst maintaining a flowing bottom hole pressure above the oil saturation pressure (\"bubble point\")\n \n \n  \n \n \n · \n At 300 psig flowing tubing head pressure, ERCE estimates the well could flow at a rate of 1,543 bopd whilst at the oil bubble point \n \n \n  \n \n \n · \n Analysis of the original drill stem test (\"DST\") in 2015 indicated a permeability of 55 millidarcies. Recent analysis by ERCE indicates a reservoir permeability of 80 millidarcies\n \n \n  \n \n \n · \n The successful proppant squeeze undertaken on the Wressle-1 well was designed to reduce the skin factor affecting the well.  The skin factor is an estimate of damage incurred during drilling, completion and/or testing.  Following this procedure, the skin factor of the well has dropped dramatically from 107 to 0.2\n \n...

More updates from Union Jack Oil Plc