Business
Tudor Gold's Step-Out Drill Hole GS-21-119 Successfully Expands the Goldstorm System to the Northeast with 1.76 g/t Gold Eq over 196.5 Meters Within 564.0 Meters Containing 1.09 g/t Gold Eq, as Well Cuts Near-Surface Gold Mineralization at the Eureka Zone with 0.76 g/t Gold Eq over 217.5 Meters at Treaty Creek
Vancouver, British Columbia--(Newsfile Corp. - September 27, 2021) - Tudor Gold Corp. ( TSXV: ...

About this update from Tudor Gold Corp.
[{"type":"text","content":"Tudor Gold's Step-Out Drill Hole GS-21-119 Successfully Expands the Goldstorm System to the Northeast with 1.76 g/t Gold Eq over 196.5 Meters Within 564.0 Meters Containing 1.09 g/t Gold Eq, as Well Cuts Near-Surface Gold Mineralization at the Eureka Zone with 0.76 g/t Gold Eq over 217.5 Meters at Treaty CreekVancouver, British Columbia--(Newsfile Corp. - September 27, 2021) - Tudor Gold Corp. (TSXV: TUD) (FSE: TUC) (the \"Company\" or \"Tudor Gold\") is pleased to present the third set of results for the 2021 resource expansion and definition drilling program for the Goldstorm Deposit at their flagship property, Treaty Creek. The project is located in the heart of the Golden Triangle of northwestern British Columbia and is on-trend from Seabridge's KSM Project located five kilometers southwest of the Goldstorm Deposit. Results from four diamond drill holes have recently been received from MSA Labs. Exploration at Treaty Creek is ongoing at Goldstorm and Eureka Zones. Treaty Creek, Drilling Highlights include:Extended the DS-5 Domain 100 meters north of GS-21-112 (core zone of 2.08 g/t AuEq over 79.5 m within 219.0 m containing 1.29 g/t AuEq) with step-out hole GS-21-119 with a strong, consistent mineralized core zone intercept of 196.5 m containing 1.76 g/t AuEq within a broader zone of 564.0 m containing 1.09 g/t AuEq.Confirmed consistent mineralization in GS-21-116 over a long interval of 1092.0 m grading 0.75 g/t AuEq that includes the 300H and CS-600 domains. Near-surface mineralization encountered at Eureka Zone in EK-21-01 with 67.5 m of 1.13 g/t AuEq within 217.5 m averaging 0.76 g/t AuEq. Eureka Zone remains open in all directions and at depth.Goldstorm Deposit remains open in all directions and at depth as drilling continues.The complete list of composited drill hole results as well as the drill hole data including hole location, elevation, depth, dip and azimuth are provided in Table 1 and Table 2, respectively. Please click on the following link to view: Plan Map and Cross Sections for the drill holes reported in this news release.Tudor Gold's Vice President of Exploration and Project Development, Ken Konkin, P.Geo., states: \"We are extremely pleased with our continued success with our step-out drilling at the Goldstorm Deposit. Due to the success of hole GS-21-119 we plan to step-out further to the northeast before...