Business
Tudor Gold Intersects 1.215 gpt AuEq over 354.0 Meters Within 1225.5 Meters of 0.702 gpt AuEq (Hole GS-20-94) and 1.078 gpt AuEq over 345.0 Meters Within 921.0 Meters of 0.821 gpt AuEq (Hole GS-20-83) at the Goldstorm Zone, Treaty Creek, Northwest B.C.
Vancouver, British Columbia--(Newsfile Corp. - December 15, 2020) - Tudor Gold Corp. (TSXV: TU...

About this update from Tudor Gold Corp.
[{"type":"text","content":"Tudor Gold Intersects 1.215 gpt AuEq over 354.0 Meters Within 1225.5 Meters of 0.702 gpt AuEq (Hole GS-20-94) and 1.078 gpt AuEq over 345.0 Meters Within 921.0 Meters of 0.821 gpt AuEq (Hole GS-20-83) at the Goldstorm Zone, Treaty Creek, Northwest B.C.Vancouver, British Columbia--(Newsfile Corp. - December 15, 2020) - Tudor Gold Corp. (TSXV: TUD) (FSE: TUC) (the \"Company\" or \"Tudor Gold\") is pleased to present results for the fifth set of diamond drill holes for the Goldstorm Zone at their flagship property, Treaty Creek. The project is located in the heart of the Golden Triangle of northwestern British Columbia and is on-trend from Seabridge's KSM Project located five kilometers southwest of the Goldstorm Zone. Results from 12 diamond drill holes have recently been received from MSA Labs with final results from another 11 diamond drill holes pending. All drill holes have successfully intersected the Goldstorm System, expanding and defining the mineralization along the northeast and southeast axes, as well as to depth. The Goldstorm System 300 Horizon has now been traced for 1100 meters along the northeast axis and, as well, the CS-600 and DS-5 zones have been expanded to the northeast and to depth. All 39 drill holes completed at Goldstorm during the 2020 program have encountered significant precious metal mineralization. The 2020 Treaty Creek Diamond Drill Program was completed last week, and field personnel have winterized the camp. The track-components of two track-mounted diamond drills remain on site ready for start-up of the 2021 exploration season.Tudor Gold's Vice President of Project Development, Ken Konkin, P.Geo., states: \"We are very pleased with the results obtained from all 39 drill holes completed this year to-date and we anticipate the release of the final 11 holes of the year within a few weeks. This brings the total to 50 drill holes that were completed this year at the Goldstorm Zone. These latest holes continued to expand the limits of the mineralized targets along the northeastern and the southeastern axes, and to depth. For a fifth consecutive press release, we have surpassed our best result from last years' drill hole program (0.697 AuEq over 1081.5 meters in hole GS-19-47) with drill holes GS-20-83 and GS-20-94 as described in the headline. The final 11 drill holes represent over 9600 meters of dril...