Business
Excellent Davis Tube Recovery Results Received for Xaudum Iron Ore Project
Excellent Davis Tube Recovery Results Received for Xaudum Iron Ore Project Toronto, Ontario ...

About this update from Tsodilo Resources Limited
[{"type":"text","content":"\nExcellent Davis Tube Recovery Results Received for Xaudum Iron Ore Project\n\nExcellent Davis Tube Recovery Results Received for Xaudum Iron Ore Project\nToronto, Ontario CANADA, May 16, 2012 /FSC/ - Tsodilo Resources Limited (TSD - TSX Venture), (\"Tsodilo\" or the \"Company\") is pleased to announce Davis Tube Recovery (\"DTR\") results from magnetite mineralization at its 100% owned Xaudum Iron Ore Project (\"Xaudum Project\" or \"Xaudum\") located in the Republic of Botswana.\nIn its Press Release of May 9, 2012, the Company set forth the assay results from the initial holes drilled in the northern part of Xaudum Ironstones. Assay results, using ME-ICP61 and ME-OG62 methods of core samples from the first three holes on the BIF Magnetite deposit, are very encouraging over large intersections with maximum values for Iron are up to 57%.\nThe Company has recently received the first results of the David Tube Recovery Tests from the ALS Ammtec laboratory in Australia for the first core samples submitted from two of the boreholes listed below. \nDavis Tube Recovery Test Results for the Xaudum Iron Project\n-***-\n-------------------------------------------------------------------------\n         Head                 % \nSample    Fe     Size     Magnetite  Fe   SiO2  Al2O3    S       P   LOI\n         Assay  fraction  recovery  Grade   \n           %                         (%)    %     %      %       %     %   \n-------------------------------------------------------------------------\n9600/10   52.8  75{micro}m   77.7   69.5  3.47  0.19   0.002  0.028 -3.25\n------------------------------------------------------...