Business

Triumph Gold Reports Results from Drilling of the Nucleus Au-Ag-Cu Deposit, Freegold Mountain Property, Yukon Territory

VANCOUVER, British Columbia, Nov. 07, 2018 (GLOBE NEWSWIRE) -- Triumph Gold Corp., (TSX-V: TIG) (OTCMKTS: TIGCF) (“Triumph Gold” or the “Company”) is pleased to

articleTriumph Gold Corp.November 7, 20185/company/triumph-gold-corp/news/triumph-gold-reports-results-from-drilling-of-the-nucleus-au-ag-cu-deposit-freegold-mountain-property-yukon-territory
Triumph Gold Reports Results from Drilling of the Nucleus Au-Ag-Cu Deposit, Freegold Mountain Property, Yukon Territory

About this update from Triumph Gold Corp.

[{"type":"text","content":" VANCOUVER, British Columbia, Nov. 07, 2018 (GLOBE NEWSWIRE) -- Triumph Gold Corp., (TSX-V: TIG) (OTCMKTS: TIGCF) (“Triumph Gold” or the “Company”) is pleased to announce the results from 4,159 metres of diamond drilling, in twenty-one holes, conducted in the Nucleus gold, silver, copper (Au-Ag-Cu) deposit area. Highlights of the 2018 Nucleus drill program include: Four high-grade gold intersections:-- 19.8 grams per tonne (g/t) gold (Au) over 0.84 metres*** (m) in N18-06 (39.62 – 40.46m)-- 15.93 g/t Au over 1.00 metre*** in N18-17 (150.00 – 151.00m)-- 13.67 g/t Au over 1.67 metres*** in N18-04 (28.51 – 30.18m)-- 9.13 g/t Au over 2.00 metres*** in N18-16 (106.00 – 108.00m) Mineralized intervals from sixteen of the twenty-one holes drilled in 2018 returned gold grades that exceed the average grade (0.544 g/t Au) of the current inferred mineral resources estimated in December 2014*. Examples include:-- 1.196 g/t Au over 45.19 metres*** in N18-08 (19.81 – 65.00m)-- 1.184 g/t Au over 59.50 metres*** in N18-17 (149.00 – 208.50m) Highlighted intersections are noted below in Table 1, a full list of significant intersections is contained in Table 2, and the location and orientation of the drill holes are listed in Table 3 and displayed on Figure 1. Table 1 – Highlighted results from 2018 Diamond Drilling at the Nucleus Au-Ag-Cu Deposit               Drill Hole From To Length*** Au Ag Cu   metre metre metre g/t g/t % N18-01 38.10 51.82 13.72 0.966 0.9 0.040 N18-04 23.09 35.05 11.96 3.030 1.9 0.307 Including 28.51 30.18 1.67 13.670 10.0 0.542 N18-06 38.10 51.30 13.20 1.980 0.4 0.146 Including 39.62 40.46 0.84 19.800 0.0 0.164 N18-08 2.04 150.11 148.07 0.619 0.1 0.046 Including 19.81 65.00 45.19 1.196 0.1 0.052 N18-16 106.00 108.00 2.00 9.130 0.0 0.120 N18-17 149.00 208.50 59.50 1.184 1.6 0.081 Including 150.00 151.00 1.00 15.930 5.0 0.551 Also Inc. 166.00 176.00 10.00 3.212 7.0 0.227 N18-18 155.45 166.73 11.28 1.075 4.1 0.314 N18-19 85.00 95.50 10.50 1.644 0.0 0.187 The 2018 drill program at Nucleus was designed to optimize a future pit-constrained estimate of mineral resources by targeting: Near-surface mineralized areas that had insufficient drill density to support estimates of mineral resources. Near-surface mineralized areas where additional delineation drilling could facilitate upgrading of In...

More updates from Triumph Gold Corp.