Business

TriStar Completes Third Phase Drilling Campaign at Castelo de Sonhos Intercepts of 29.30 m at 1.92 g/t gold and 12.85 m at 3.45 g/t gold Updates Metallurgical Testwork

(via Thenewswire.ca) Houston, TX / TNW-ACCESSWIRE / July 9 2014 / TriStar Gold Inc. (t...

articleTristar Gold Inc.July 9, 20145/company/tristar-gold-1/news/tristar-completes-third-phase-drilling-campaign-at-castelo-de-sonhos-intercepts-of-2930-m-at-192-gt-gold-and-1285-m-at-345-gt-gold-updates-metallurgical-testwork
TriStar Completes Third Phase Drilling Campaign at Castelo de Sonhos Intercepts of 29.30 m at 1.92 g/t gold and 12.85 m at 3.45 g/t gold Updates Metallurgical Testwork

About this update from Tristar Gold Inc.

[{"type":"text","content":"TriStar Completes Third Phase Drilling Campaign at Castelo de Sonhos Intercepts of 29.30 m at 1.92 g/t gold and 12.85 m at 3.45 g/t gold Updates Metallurgical Testwork(via Thenewswire.ca)\n \n \nHouston, TX / TNW-ACCESSWIRE / July 9 2014 / TriStar Gold Inc. (the Company) is pleased to announce the remaining and final results from the third phase diamond drilling program at the Company's Castelo de Sonhos Gold Project (\"CDS\") in the Tapajos region of Para state, Brazil. Results have been received for the last twenty nine (29) holes drilled at the Esperanca South target. In addition, two holes drilled by Barrick Gold in 1996 were added to the data-bank after they had been precisely re-located and were re-logged, re-sampled and re-assayed.\n\n\n \nThe third phase drilling program at CDS comprised 51 holes for a total of 4,110 meters. To date, 144 holes totalling 16,213 meters have been drilled at Castelo de Sonhos by TriStar. All drilling campaigns were conducted by Layne do Brasil Ltda.\n\n\n \nSome holes (DH-95, 98,104,110 and 112), were re-entered and deepened when initial drilling bottomed in mineralization or when expected mineralized zones were missed. This deepening of the drill holes extended some of the mineralized zones with depth and located some of the missed mineralized zones. \n\n\n \nMark E Jones III, President and CEO of TriStar stated: \"The current drilling at Esperanca South only focused on 2.75 km of the 16 km strike length of outcropping conglomerates associated with strong gold-in-soil anomaly and extensive old surface garimpeiro workings. We will continue our efforts to expand the mineralization along this trend as well as down-dip, to test for the presence of a larger mineralized basin. The positive metallurgy and good infrastructure in a free gold environment should provide a low cost setting.\"\n\n \n \nThe table below summarizes the most significant drilling intercepts from twenty nine new holes, two resampled Barrick holes and the new intervals from five deepened holes.\n\n \n\nHole\n\n\n\n\nIntercept (Au)\n\n\n\n\nFrom (m)\n\n\n\n\nTo (m)\n\n\n\n\nFinal Depth (m)\n\n\n\n\nCSH-95*\n\n\n\n\n1.50 m at 1.50 g/t\n\n\n\n\n77.70\n\n\n\n\n79.20 (open)\n\n\n\n\n79.20\n\n\n\n\nCSH-104\n\n\n\nIncluding\n\n\n\n\n29.30 m at 1.92 g/t\n\n\n\n5.75 m @ 4.31 g/t\n\n\n\n\n54.70\n\n\n\n64.50\n\n\n\n\n84.00\n\n\n\n70.25\n...

More updates from Tristar Gold Inc.