World
Trinasolar Powers Landmark 40 MW Northern Philippine Solar Project by PetroGreen
Trinasolar, a global smart PV and energy storage solutions provider, has supplied 52,000 of its n-type i-TOPCon Vertex N 710-715W (NEG21C.20) modules for the Limbauan Solar Power Project (LSPP), a 40-megawatt direct current (MWdc) solar facility in San Pablo, Isabela, Philippines. Developed by BKS Green Energy Corporation (BKS), a subsidiary of Rizal Green Energy Corporation (RGEC), a joint venture between PetroGreen Energy Corporation (PGEC) and Japan's TAISEI Corporation, the project aims to b
About this update from Trina Solar Ltd Class A
[{"type":"text","content":"MANILA, Philippines, May 13, 2025 /PRNewswire/ -- Trinasolar, a global smart PV and energy storage solutions provider, has supplied 52,000 of its n-type i-TOPCon Vertex N 710-715W (NEG21C.20) modules for the Limbauan Solar Power Project (LSPP), a 40-megawatt direct current (MWdc) solar facility in San Pablo, Isabela, Philippines. Developed by BKS Green Energy Corporation (BKS), a subsidiary of Rizal Green Energy Corporation (RGEC), a joint venture between PetroGreen Energy Corporation (PGEC) and Japan's TAISEI Corporation, the project aims to bolster Luzon grid's renewable energy supply.","length":607,"tagName":"p"},{"type":"image","alt":"Trinasolar, PGEC and BKS personnel with San Pablo Mayor Antonio N. Miro, Jr. (6th from left) and Vice Mayor Anjo T. Miro (7th from left) with participants of the solar installation training","displaySize":"","headline":null,"caption":"Trinasolar, PGEC and BKS personnel with San Pablo Mayor Antonio N. Miro, Jr. (6th from left) and Vice Mayor Anjo T. Miro (7th from left) with participants of the solar installation training","className":"","disableSlideshowImg":false,"size":{"original":{"width":400,"height":300,"url":"https://media.zenfs.com/en/prnewswire.com/92e415ef0f206093bc08f78ef80713b6"},"resized":{"url":"https://s.yimg.com/ny/api/res/1.2/RN3ru8chjrbzerAzQs4zvg--/YXBwaWQ9aGlnaGxhbmRlcjt3PTcwNTtoPTUyOTtjZj13ZWJw/https://media.zenfs.com/en/prnewswire.com/92e415ef0f206093bc08f78ef80713b6","width":400,"height":300}},"href":"https://mma.prnewswire.com/media/2683408/20250318_020324171_iOS.html","hrefExternal":true,"rel":"nofollow"},{"type":"text","content":"LSPP is projected to generate approximately 59 gigawatt-hours (GWh) of clean energy annually, sufficient to power around 33,000 households and reduce carbon dioxide emissions by about 31,700 metric tons. This initiative marks a significant step towards enhancing Philippines' renewable energy infrastructure and promoting sustainable development.","length":350,"tagName":"p"},{"type":"text","content":"The project is divided into two phases: a 6 MWdc Phase 1 connecting to the Isabela Electric Cooperative-II (ISELCO-II) system, and a 34 MWdc Phase 2 connecting to the National Grid Corporation of the Philippines' (NGCP) 69 kV Tuguegarao-Cabagan line via a 4.73 km dedicated transmission facility.","length":300,"tagName":"p"},{"typ...