Business

Rockridge Resources Intersects Additional High Grade Copper in Drill Holes on the Knife Lake Project including 2.01% Cu and 2.45% CuEq over 15.2m Beginning at 5.1m Downhole

VANCOUVER, British Columbia, June 10, 2019 (GLOBE NEWSWIRE) -- Rockridge Resources Ltd. (TSX-V:ROCK) (Frankfurt: RR0) (“Rockridge” or the “Company”) is pleased

articleTrident Resources Corp.June 10, 20194/company/trident-resources-corp/news/rockridge-resources-intersects-additional-high-grade-copper-in-drill-holes-on-the-knife-lake-project-including-201percent-cu-and-245percent-cueq-over-152m-beginning-at-51m-downhole
Rockridge Resources Intersects Additional High Grade Copper in Drill Holes on the Knife Lake Project including 2.01% Cu and 2.45% CuEq over 15.2m Beginning at 5.1m Downhole

About this update from Trident Resources Corp.

[{"type":"text","content":" VANCOUVER, British Columbia, June 10, 2019 (GLOBE NEWSWIRE) -- Rockridge Resources Ltd. (TSX-V:ROCK) (Frankfurt: RR0) (“Rockridge” or the “Company”) is pleased to report additional results from its inaugural winter diamond drilling program at its flagship Knife Lake Project located in Saskatchewan (the “Knife Lake Project” or “Property”). Rockridge recently entered into an Option Agreement with Eagle Plains Resources Ltd. to acquire a 100% interest in the Property that covers the majority of the historical Knife Lake Cu-Zn-Ag-Co VMS deposit. The contiguous claims total approximately 85,196 hectares and are located approximately 50 km northwest of Sandy Bay, Saskatchewan. Knife Lake VMS Project Map: Click Here The analytical results are summarized below and indicate high grade intercepts in six holes, including a wide intercept in hole KF19006. Drill hole KF19006 tested the up-dip extension of the Knife Lake deposit in an area that had not been previously tested. The drill hole intersected net-textured to semi-massive sulphide mineralization from 5.1m to 20.3m downhole. The 15.2m interval returned 2.01% Cu, 0.39 g/t Au, 8.16 g/t Ag, 0.17% Zn, and 0.02% Co for an estimated 2.45% CuEq. Drill hole KF19007 which tested the down-dip extension of the deposit in the same area as KF19006, intersected interstitially-forming to net-textured sulphides between 39.1m to 42.0m. KF19007 returned 2.95m of 0.66% Cu, 0.1 g/t Au, and 2.6 g/t Ag for an estimated 0.82% CuEq. Drill holes KF19009, KF19010, KF19011, and KF19012 were drilled in the southern extent of the deposit in areas that had either not been drill tested and/or where historical assays had not been validated. All four drill holes intersected zones of disseminated, interstitially-forming to net-textured sulphide mineralization. Drill hole KF19011 intersected 14.2m of 0.60% Cu, 0.07 g/t Au, 2.02 g/t Ag, 0.20% Zn, and 0.01% Co for an estimated 0.77% CuEq. Drill hole KF19012 intersected 10.6m of 0.61% Cu, 0.09 g/t Au, 2.6 g/t Ag, and 0.17% Zn for an estimated 0.76% CuEq. Interpretation and QA/QC has now been completed on all twelve holes from the program. Highlighted intersections from the drill holes are reported in the table below. The Company is now working towards completing an NI 43-101 compliant resource estimate for Knife Lake with the results from this drill program. Followi...

More updates from Trident Resources Corp.