Business
Trevali Reports Q3-2016 Production of 32.4 Million Lbs Zinc, 9.7 Million Lbs Lead and 362,776 Ounces of Silver
Trevali Reports Q3-2016 Production of 32.4 Million Lbs Zinc, 9.7 Million Lbs Lead and 362,776 Ounces of Silver.

About this update from Trevali Mining Corp.
[{"type":"text","content":"\n \n \n Trevali Reports Q3-2016 Production of 32.4 Million Lbs Zinc, 9.7 Million Lbs Lead and 362,776 Ounces of Silver\n \n \nTrevali Reports Q3-2016 Production of 32.4 Million Lbs Zinc, 9.7 Million Lbs Lead and 362,776 Ounces of Silver\n\nRecord Quarterly Zinc Production from Santander\n\n \n VANCOUVER, BRITISH COLUMBIA--(Marketwired - Oct 13, 2016) - Trevali Mining Corporation (\"Trevali\" or the \"Company\") (TSX:TV)(LMA:TV)(OTCQX:TREVF)(FRANKFURT:4TI) reports preliminary third quarter (\"Q3\") 2016 production results from its two operating zinc mines, the Caribou Mine in New Brunswick, Canada and the Santander Mine in Lima, Peru. For the three months ending September 30, 2016, approximately 32.4 million payable pounds zinc, 9.7 million payable pounds lead and 362,776 payable ounces of silver were produced (see Table 1).\n \n \n \n \n \n \n Table 1: Consolidated Q3-2016 preliminary production statistics\n \n \n \n \n \n Q3-2016\n \n Q3-2015\n \n \n \n \n Caribou\n \n Santander\n \n Consolidated\n \n Caribou\n \n Santander\n \n Consolidated\n \n \n Tonnes Mined\n \n 205,049\n \n 192,805\n \n \n \n -\n \n 189,567\n \n \n \n \n Tonnes Milled\n \n 185,488\n \n 216,551\n \n \n \n -\n \n 197,288\n \n \n \n \n Average Head Grades:\n \n \n \n \n \n \n \n \n \n \n \n \n \n \n Zinc\n \n 5.91%\n \n 4.60%\n \n \n \n -\n \n 4.40%\n \n \n \n \n Lead\n \n 2.62%\n \n 1.08%\n \n \n \n -\n \n 2.09%\n \n \n \n \n Silver (ounces/ton)\n \n 2.26 oz/t\n \n 1.26 oz/t\n \n \n \n -\n \n 1.7\n \n \n \n \n Average Recoveries (%):\n \n \n \n \n \n \n \n \n \n \n \n \n \n \n Zinc\n \n 78%\n \n 89%\n \n \n \n -\n \n 90%\n \n \n \n \n Lead\n \n 56%\n \n 84%\n \n \n \n -\n \n 89%\n \n \n \n \n Silver (in lead concentrate)\n \n 36%\n \n 67%\n \n \n \n -\n \n 77%\n \n \n \n \n Concentrate Produced DMT \n (dry metric tonnes):\n \n \n \n \n \n \n \n \n \n \n \n \n \n \n Zinc\n \n 17,908\n \n 18,403\n \n \n \n -\n \n 15,729\n \n \n \n \n Lead\n \n 6,973\n \n 3,745\n \n \n \n -\n \n 6,525\n \n \n \n \n Concentrate Grades:\n \n \n \n \n \n \n \n \n \n \n \n \n \n \n Zinc\n Silver in zinc conc.\n \n 48%\n 4.5 oz/ton\n \n 48%\n -\n \n \n \n -\n -\n \n 50%\n -\n \n \n \n \n Lead\n \n 39%\n \n 53%\n \n \n \n -\n \n 56%\n \n \n \n \n Silver in lead conc.\n \n 21.4 oz/ton\n \n 53.1 oz/t\n \n \n \n -\n \n 41.73\n \n \n \n \n Payable Production:\n \n \n \n \n \n \n \n \n ...