Business

Trevali Announces Drill Results Extending the Western Orefield Deposit at Rosh Pinah at Depth and Along Strike

Trevali Announces Drill Results Extending the Western Orefield Deposit at Rosh Pinah at Depth and Along Strike.

articleTrevali Mining Corp.February 26, 20204/company/trevali-mining-corporation/news/trevali-announces-drill-results-extending-the-western-orefield-deposit-at-rosh-pinah-at-depth-and-along-strike
Trevali Announces Drill Results Extending the Western Orefield Deposit at Rosh Pinah at Depth and Along Strike

About this update from Trevali Mining Corp.

[{"type":"text","content":"\n VANCOUVER, British Columbia, Feb. 26, 2020 (GLOBE NEWSWIRE) -- Trevali Mining Corporation (“Trevali” or the “Company”) (TSX: TV, BVL: TV; OTCQX: TREVF, Frankfurt: 4TI) announces results from the 2019 exploration program at Rosh Pinah with a high grade extension to WF3 identified to the South. “We are encouraged by the results from the exploration program at Rosh Pinah and the ability to keep intersecting high grade zones at the Western Orefield and extending the deposit further North,” commented Yan Bourassa, Vice-President of Exploration and Mineral Resources at Trevali Mining. “The continued ability to increase the Mineral Resource base at Rosh Pinah and extending the deposit indicates the quality of the orebody and demonstrates the team’s ability to support Trevali’s long term strategy of growth at Rosh Pinah.” Highlights Exploration hole U3373 intersected 19.99 metres at 7.2% Zn, 1.8% Pb including 3 metres at 14.2% Zn & 57.81m at 9.2% Zn 3.3% Pb 43.4g/t Ag including 30.44 metres at 12.7% Zn, 5% Pb & 72.6g/t Ag.Exploration hole U3372 intersected 38.77 metres at 9.5% Zn, 2.3% Pb, 12.8g/t Ag including 9.15 metres at 15.4% Zn, 5.2% Pb, 28.2g/t Ag (exploration).Infill hole U3351 intersected 32.05 metres at 8.9% Zn, 0.7% Pb, 10.65g/t Ag including 6 metres at 15.9% Zn, 0.6% Pb, 10.8g/t Ag & 44.75 metres at 11.19% Zn, 0.46% Pb, 1% Cu, 14.7g/t Ag including 15.5m at 14.51% Zn, 0.9% Pb, 17g/t Ag & 43.85 metres at 9.95% Zn, 0.9% Pb, 8.2g/t Ag including 7.45 metres at 20.62% Zn, 0.3% Pb, 11.8g/t Ag. 2019 Exploration Strategy During 2019, the exploration team has focused on fully exploiting the wealth of historic data accumulated over 50 years of continuous mining, including by identifying in-mine targets that were previously sporadically explored. Continued system analysis and structural reinterpretation is helping to improve the understanding of the Rosh Pinah mineralizing system and assist with targeting. The Rosh Pinah mineralisation was long thought to be hosted exclusively along a single horizon; however by challenging these perceptions, new opportunities are being identified. In-Mine Exploration The Western Orefield 3 (WF3), the largest single zone within the Rosh Pinah mine, was previously considered closed along strike to the South East. Following stru...

More updates from Trevali Mining Corp.