Business

Transition Metals Drilling Returns Broad Intervals of Copper and 3E PGE (Pt + Pd + Au) Mineralization at the Saturday Night Project

Highlights from this release include:Drilling has significantly expanded the known mineralized footprint of magmatic sulphide mineralization associated with the basal portions of the Saturday Night intrusion.The newly identified PGE-Ni-Cu mineralized envelope, measuring approximately 800m by 200m, remains open in all directions.SN-25-03-X (extension) intersected 14.44m of 0.61 g/t 3E PGE (3E PGE = Pt + Pd + Au) & 0.13% Cu, including 4.64m of 1.24 g/t 3E PGE & 0.21% Cu, and including 0.60m of...

articleTransition Metals Corp.January 27, 20269/company/transition-metals-corp/news/transition-metals-drilling-returns-broad-123100313
Transition Metals Drilling Returns Broad Intervals of Copper and 3E PGE (Pt + Pd + Au) Mineralization at the Saturday Night Project

About this update from Transition Metals Corp.

[{"type":"text","content":"Highlights from this release include:","length":37,"tagName":"p"},{"type":"list","items":[{"val":[{"type":"text","content":"Drilling has significantly expanded the known mineralized footprint of magmatic sulphide mineralization associated with the basal portions of the Saturday Night intrusion.","length":171,"tagName":"p","attribs":{}}]},{"val":[{"type":"text","content":"The newly identified PGE-Ni-Cu mineralized envelope, measuring approximately 800m by 200m, remains open in all directions.","length":122,"tagName":"p","attribs":{}}]},{"val":[{"type":"text","content":"SN-25-03-X (extension) intersected 14.44m of 0.61 g/t 3E PGE (3E PGE = Pt + Pd + Au) & 0.13% Cu, including 4.64m of 1.24 g/t 3E PGE & 0.21% Cu, and including 0.60m of 2.45 g/t 3E PGE & 0.30% Cu.","length":206,"tagName":"p","attribs":{}}]},{"val":[{"type":"text","content":"SN-25-04 intersected 10.33m of 0.38 g/t 3E PGE & 0.17% Cu, including 6.39m of 0.45 g/t 3E PGE & 0.18% Cu, and including 0.62m of 0.99 g/t 3E PGE & 0.34% Cu.","length":168,"tagName":"p","attribs":{}}]},{"val":[{"type":"text","content":"SN-25-05 intersected 10.75m of 0.76 g/t 3E PGE & 0.18% Cu, including 5.05m of 1.40 g/t 3E PGE & 0.31% Cu, and including 1.03m of 1.98 g/t 3E PGE & 0.29% Cu.","length":168,"tagName":"p","attribs":{}}]}],"tagName":"ul","bulletedList":true,"length":835,"olType":false},{"type":"text","content":"Sudbury, Ontario--(Newsfile Corp. - January 27, 2026) - Transition Metals Corp. (TSXV: XTM) ("Transition", "the Company"), is pleased to disclose assay results from drilling completed in December 2025 at its 100%-owned Saturday Night PGE Project, located approximately 30 kilometres north of Thunder Bay, Ontario (see news release dated November 10, 2025). The program saw the extension of hole SN-25-03-X beyond the basal contact, plus the addition of two new holes (SN-25-04 and SN-25-05), totaling a combined 1,463 metres. All holes intersected broad intervals of PGE-Ni-Cu mineralization occurring along the basal contact of the Saturday Night layered intrusion.","length":686,"tagName":"p"},{"type":"text","content":"Commenting on the results, CEO Scott McLean stated, "We are very encouraged by the thick sequences of differentiated Mid-Continental Rift (MCR) intrusion we have drilled at Saturday Night, with the growing footpr...

More updates from Transition Metals Corp.

Transition MetalsSaturday Nightmineralizationdrill hole