Business
TransAlta Announces Accelerated Transition to Clean Energy
TransAlta Announces Accelerated Transition to Clean Energy Canada NewsWire CALGA...

About this update from Transalta Corporation
[{"type":"text","content":"\n\n\n\nTransAlta Announces Accelerated Transition to Clean Energy\n\n/* Style Definitions */\nspan.prnews_span\n{\nfont-size:8pt;\nfont-family:\"Arial\";\ncolor:black;\n}\na.prnews_a\n{\ncolor:blue;\n}\nli.prnews_li\n{\nfont-size:8pt;\nfont-family:\"Arial\";\ncolor:black;\n}\np.prnews_p\n{\nfont-size:0.62em;\nfont-family:\"Arial\";\ncolor:black;\nmargin:0in;\n}\n.prngen4{\nBORDER-BOTTOM:black 0pt; BORDER-LEFT:black 0pt; PADDING-LEFT:0.50em; PADDING-RIGHT:0.50em; VERTICAL-ALIGN: BOTTOM; BORDER-TOP:black 0pt; BORDER-RIGHT:black 0pt\n}\n.prngen1{\nBORDER-BOTTOM:0pt; BORDER-LEFT:0pt; BORDER-COLLAPSE: COLLAPSE; BORDER-TOP:0pt; BORDER-RIGHT:0pt\n}\n.prngen3{\nBORDER-BOTTOM:black 1pt solid; BORDER-LEFT:black 0pt; PADDING-LEFT:0.50em; PADDING-RIGHT:0.50em; VERTICAL-ALIGN: BOTTOM; BORDER-TOP:black 0pt; BORDER-RIGHT:black 0pt\n}\n.prngen5{\nBORDER-BOTTOM:1pt; BORDER-LEFT:1pt; PADDING-LEFT:0.50em; PADDING-RIGHT:0.50em; VERTICAL-ALIGN: BOTTOM; BORDER-TOP:1pt; BORDER-RIGHT:1pt\n}\n.prntblns{\nBORDER-BOTTOM: 1pt; BORDER-LEFT: 1pt; BORDER-COLLAPSE: collapse; BORDER-TOP: 1pt; BORDER-RIGHT: 1pt\n}\n\n\n\n\n\n\n\nCanada NewsWire\nCALGARY, Dec. 6, 2017\n\n\n\nCALGARY, Dec. 6, 2017 /CNW/ - TransAlta Corporation (\"TransAlta\" or the \"Company\") (TSX: TA; NYSE: TAC) announced today that its Board of Directors has approved additional elements in the Company's strategy to accelerate its transition to gas and renewables generation.  These elements include:\n\n\nEntering into a letter of intent with Tidewater Midstream and Infrastructure Ltd. (\"Tidewater\") to construct a 120 kilometre natural gas pipeline from Tidewater's Brazeau River Complex to TransAlta's generating units at Sundance and Keephills to eventually supply the Company with up to 340 million cubic feet of gas per day;\nAccelerating the conversion of Sundance Units 3 to 6 and Keephills Units 1 and 2 from coal-fired generation to gas-fired generation in the 2021 to 2022 timeframe, a year earlier than originally planned.  The coal-fired plants operated by TransAlta, once converted to gas, are anticipated to be able to run through to 2031 to 2039 – a significant lengthening of their asset lives; and\nMothballing temporarily a combination of Sundance units in 2018 and 2019 to ensure that two Sundance coal units can operate at high capacity utilizations with lower costs thro...