Business

Tisdale Clean Energy Completes First Two Drill Holes at the South Falcon East Uranium Project, Athabasca Basin, Saskatchewan

(TheNewswire) Vancouver B.C. - TheNewswire - April 1, 2024 – TISDALE CLE...

articleTerra Clean Energy Corp.April 1, 20245/company/tisdale-clean-energy-corp/news/tisdale-clean-energy-completes-first-two-drill-holes-at-the-south-falcon-east-uranium-project-athabasca-basin-saskatchewan
Tisdale Clean Energy Completes First Two Drill Holes at the South Falcon East Uranium Project, Athabasca Basin, Saskatchewan

About this update from Terra Clean Energy Corp.

[{"type":"text","content":"Tisdale Clean Energy Completes First Two Drill Holes at the South Falcon East Uranium Project, Athabasca Basin, Saskatchewan\n \n \n (TheNewswire)\n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n Vancouver B.C. -\n \n \n TheNewswire\n-\n \n \n April 1,\n2024\n \n \n – TISDALE CLEAN ENERGY\nCORP.\n \n \n (“\n \n \n Tisdale\n \n \n ” or the\n \n \n “\n \n \n Company\n \n \n ”)\n \n \n (TSXV:TCEC\n \n \n )\n \n \n ,\n \n \n (\n \n \n OTC:\n \n \n TCEFF\n \n \n )\n \n \n ,\n \n \n (\n \n \n FSE:\n \n \n T1KC\n \n \n )\n \n \n ,\n \n \n is pleased to provide\nan update on the phase one diamond drill program recently conducted at\nthe South Falcon East Uranium Project, which hosts the Fraser Lakes B\nuranium deposit.\n \n \n \n \n The 12,464-ha South Falcon East Project lies 18 km\noutside the edge of the Athabasca Basin, approximately 50 km east of\nthe Key Lake uranium mill and former mine (Figure 1). Tisdale Clean\nEnergy Corp entered into an option agreement with Skyharbour Resources\nLtd in October of 2022 whereby the company can earn up to a 75%\ninterest in the South Falcon East property.\n \n \n \n \n This initial 2024 program is scheduled to complete up\nto 1500m of drilling in two phases, with the priority being the\nconfirmation of existing mineralization.  Follow-up drill programs\nwill then be pursued to both facilitate expansion of the known Fraser\nLake B deposit and to test multiple additional high-priority\nexploration targets at South Falcon East (Figure 2).\n \n \n \n \n Phase one included 442m drilled in the first two drill\nholes. Hole SF-0059 was completed to a depth of 221m and intersected\nmultiple zones of uranium mineralization over 13.5m, confirming the\npresence of mineralization in the vicinity of historical hole FP-15-05\n(see below).  Mineralization occurs within altered pelitic gneiss\ncontaining granitic pegmatites, overlying graphitic pelitic gneiss.\n \n \n \n \n Highlights include:\n \n \n \n \n \n \n 0.02% eU\n \n \n over 5.6 m\n \n \n from\n129.65 to 135.25 m, including:\n \n \n \n \n \n \n 0.07% eU\n \n \n over 1.1 m\n \n \n from\n131.75 to 132.85 m.  This included a 0.2 m interval grading\n \n \n 0.11% eU\n \n \n \n \n \n \n \n \n 0.03% eU\n \n \n over 4.1 m\n \n \n from\n137.65 to 141....

More updates from Terra Clean Energy Corp.