Business
Thunder Gold Announces Fully Funded Phase Three Drill Program at Tower Mountain
Thunder Bay, Ontario--(Newsfile Corp. - September 23, 2025) - Thunder Gold Corp. (TSXV: TGOL) (FSE: Z25) (OTCQB: TGOLF) ("Thunder Gold" or the "Company") is pleased to announce the fully funded Phase Three drill program at its 100%-owned, 2,500-hectare, Tower Mountain Gold Property, located 50 kilometres west of Thunder Bay, Ontario. The recently completed Phase Two drilling as announced on September 8, 2025 confirmed Tower Mountain as a highly consistent and scalable gold system, demonstrating.
About this update from Thunder Gold Corp.
[{"type":"text","content":"Thunder Bay, Ontario--(Newsfile Corp. - September 23, 2025) - Thunder Gold Corp. (TSXV: TGOL) (FSE: Z25) (OTCQB: TGOLF) ("Thunder Gold" or the "Company") is pleased to announce the fully funded Phase Three drill program at its 100%-owned, 2,500-hectare, Tower Mountain Gold Property, located 50 kilometres west of Thunder Bay, Ontario.","length":355,"tagName":"p"},{"type":"text","content":"The recently completed Phase Two drilling as announced on September 8, 2025 confirmed Tower Mountain as a highly consistent and scalable gold system, demonstrating the potential for a much larger discovery. The Phase Three drill program is scheduled to commence October 1st, 2025.","length":280,"tagName":"p"},{"type":"text","content":"Key Highlights:","length":15,"tagName":"p"},{"type":"list","items":[{"val":[{"type":"text","content":"Phase Three Fully Funded Drill Program to begin October 1, 2025 at Tower Mountain.","length":82,"tagName":"p","attribs":{}}]},{"val":[{"type":"text","content":"2,000 metres planned, with ~70% focused on infill drilling along the 1,800-metre western contact of the Tower Mountain Intrusive Complex ("TMIC").","length":156,"tagName":"p","attribs":{}}]},{"val":[{"type":"text","content":"Strategic program designed to advance a pit-constrained Mineral Resource Estimate for the western TMIC contact.","length":111,"tagName":"p","attribs":{}}]},{"val":[{"type":"text","content":"Program will target gaps in drill coverage to support geological confidence and future resource classification.","length":111,"tagName":"p","attribs":{}}]},{"val":[{"type":"text","content":"Phase Two results validated continuity of mineralization and demonstrated strong potential to expand mineralization footprint elsewhere around the TMIC.","length":152,"tagName":"p","attribs":{}}]},{"val":[{"type":"text","content":"Rising gold prices and the project's infrastructure advantages support rapid advancement toward development.","length":112,"tagName":"p","attribs":{}}]}],"tagName":"ul","bulletedList":true,"length":724,"olType":false},{"type":"text","content":"Wes Hanson, President and CEO, states, "We are strategically focusing the Phase Three drilling to rapidly establish the resource potential of the western TMIC contact. Phase Two drilling not only reinforced Tower Mountain's scale and consistency but also val...