Business
Quarterly Report July to September 2022
Quarterly Report July to September 2022.

About this update from Thor Energy Plc
[{"type":"text","content":"\n \n \n \n 31 October 2022\n \n \n \n \n \n Thor Mining PLC\n \n \n \n \n \n (\"Thor\" or the \"Company\")\n \n \n \n \n \n Quarterly Activities Report\n \n \n \n \n \n July to September 2022\n \n \n \n \n \n \n \n \n \n \n Highlights\n \n \n \n \n \n \n Outlook for December Quarter 2022\n \n \n \n \n \n \n \n \n URANIUM\n \n \n \n \n Wedding Bell Project, Colorado USA\n \n \n \n \n \n \n \n \n \n \n \n \n \n \n ·\n Commenced drilling to test three priority prospects within the Wedding Bell and Radium Mountain projects, including Groundhog, Rim Rock and Section 23.\n \n \n \n \n \n \n \n \n \n ·\n Downhole gamma logging of drillholes.\n \n \n ·\n Assay results from drilling program.\n \n \n \n \n \n \n \n GOLD, LITHIUM, NICKEL\n \n \n \n \n Ragged Range, Pilbara region, WA Australia\n \n \n \n \n \n \n \n \n \n \n \n \n \n \n · \n RC drilling program completed at Kelly's Prospect testing beneath high-grade rock-chips (15.5g/t Au) and historic drillhole with 1.52m @ 22.92g/t Au reported.\n \n \n ·\n 3120m RC drilling program completed in early July 2022 at Sterling and Krona Prospects.\n \n \n ·\n Krona Prospect nickel hole intercepted edge of electromagnetic conductor returning 66m @ 0.2% Ni from 81m (22RRC045).\n \n \n ·\n An airborne magnetics survey was completed over the eastern portion of the tenure.\n \n \n \n \n \n \n \n ·\n Kelly's Prospect RC drilling assay results.\n \n \n ·\n Platinum Group Element \"PGE\" assay results for Krona drillhole.\n \n \n ·\n Prospectivity targeting from airborne magnetics survey.\n \n \n \n \n \n \n \n \n \n \n COPPER\n \n \n \n \n Alford East, SA Australia\n \n \n \n ·\n Hydrogeology quarterly water characterisation sampling undertaken.\n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n ·\n Further metallurgical testing to maximise copper recoveries.\n \n \n \n \n \n \n \n Kapunda, SA Australia (via 30% equity holding in EnviroCopper Ltd)\n \n \n \n \n \n \n \n ·\n Investment from OZ Minerals of A2.5 million over 18 months to support In Situ Recovery (ISR) research at the Kapunda Project.\n \n \n ·\n Final approvals for lixiviant stage of Push Pull test underway\n \n \n \n \n \n \n \n ·\n Contract detais to be finalised\n \n \n ·\n Scoping Study with OZ Minerals to commence.\n \n \n \n \n \n \n \n TUNGSTEN &...