Business

Ore Sorting Proof of Concept - Spring Hill Project

Ore Sorting Proof of Concept - Spring Hill Project.

articleThor Energy PlcJuly 8, 20135/company/thor-mining-plc/news/ore-sorting-proof-of-concept-spring-hill-project
Ore Sorting Proof of Concept - Spring Hill Project

About this update from Thor Energy Plc

[{"type":"text","content":"\n \nRNS Number : 7598I Thor Mining PLC 08 July 2013  \n\n \n8 July 2013\n \nTHOR MINING PLC\n \nORE SORTING PROOF OF CONCEPT - SPRING HILL PROJECT NT\n \n \nThe Directors of Thor Mining PLC (\"Thor\") (AIM, ASX: THR) are pleased to announce positive results from initial ore sorting test work on near surface oxide ore from the Spring Hill gold project south of Darwin in Australia's Northern Territory. \n \nSpring Hill gold mineralisation is vein hosted and the positive results, using X-ray scanning, demonstrate \"proof of concept\" that Spring Hill gold bearing material can be identified and segregated.  Further testing on a larger sample is scheduled in South Africa which will allow Thor to better predict commercial outcomes.\n \nOre sorting is a process of upgrading ore prior to the costly fine crushing and grinding in the ore processing circuit.  The coarse material, generally of a size fraction between 20mm & 150mm, is scanned and segregated according to criteria developed by test work.  After sorting, mineralised material progresses through the rest of the circuit, while non-mineralised material is discarded as waste. This pre-concentrating process has the potential to reduce downstream processing costs of fine crushing, grinding, and cyanidation. The process is not suitable for all styles of mineralisation, however it is used in some circumstances to upgrade low grade gold stockpiles in South Africa.  It has now been demonstrated as a potential enhancement for Spring Hill.\n \nPending confirmation by subsequent test work (likely to take up to 3 months), internal modelling, suggest the following range of outcomes for Spring Hill near surface oxide mineralisation, using a cost of A$7.00/tonne to crush & sort,\n \n\n\n\n\nProportion of sort discarded as waste¹\n\n\nCost saving per ounce A$\n\n\n\n\n20%\n\n\nNIL\n\n\n\n\n35%\n\n\n$100\n\n\n\n\n50%\n\n\n$200\n\n\n\n\n1.    The above range should not be classed as estimates and should be used for example purposes only.\n\n\n\n\n \nThor holds a 51% equity interest in the Spring Hill project, and is exercising rights to increase that interest to 80% from Western Desert Resources Limited (ASX \"WDR\").\n     \nCommenting, Mr Mick Billing, Executive Chairman of ...

More updates from Thor Energy Plc