Business

Treaty Creek Property-Goldstorm Zone Strengthens to the Northeast 150 Metre Step-Out Intersects 370.5 Meters of 1.095 G/T Gold Including an Interval of 252 Meters of 1.268 G/T Gold Within 780 Meter Interval Grading 0.683 G/T Gold; Second Drill Mobilized to Site

(via TheNewswire) Vancouver, Canada - TheNewswire - July 3 1 , 2019 - Teuton Resou...

articleTeuton Resources Corp.July 31, 20193/company/teuton-resources-corp/news/treaty-creek-property-goldstorm-zone-strengthens-to-the-northeast-150-metre-step-out-intersects-3705-meters-of-1095-gt-gold-including-an-interval-of-252-meters-of-1268-gt-gold-within-780-meter-interval-grading-0683-gt-gold-second-drill-mobilized-to-site
Treaty Creek Property-Goldstorm Zone Strengthens to the Northeast 150 Metre Step-Out Intersects 370.5 Meters of 1.095 G/T Gold Including an Interval of 252 Meters of 1.268 G/T Gold Within 780 Meter Interval Grading 0.683 G/T Gold; Second Drill Mobilized to Site

About this update from Teuton Resources Corp.

[{"type":"text","content":"Treaty Creek Property-Goldstorm Zone Strengthens to the Northeast 150 Metre Step-Out Intersects 370.5 Meters of 1.095 G/T Gold Including an Interval of 252 Meters of 1.268 G/T Gold Within 780 Meter Interval Grading 0.683 G/T Gold; Second Drill Mobilized to Site(via TheNewswire)\n\n \nVancouver, Canada - TheNewswire - July 31, 2019 - Teuton Resources Corp. (\"Teuton\" or \"the Company\") (TSXV:TUO) (Frankfurt:TUC) has received a report from JV partner Tudor Gold containing assay results from the first three holes of the 2019 drilling program at Treaty Creek. The Treaty Creek property is located in the Golden Triangle region of BC, immediately north of and along regional strike from Seabridge Gold's KSM property and Pretium Resources' Brucejack-Snowfield property.\n\n\n \nTudor Gold Exploration Manager, Ken Konkin explains: \"The Goldstorm system continues to grow rapidly along strike to the northeast and towards the footwall contact zone to the southeast. The best near-surface intercept obtained to-date on the project has been obtained from the latest hole; GS19-42. This is a vertical hole that is a 150m step-out to the northeast from drill hole CB18-39 (0.981g/t Au over 563.8m intercept). The higher grade upper portion of last year's hole CB18-39 averaged 1.141 g/t Au over 280.5m compared to the same upper mineralized horizon of GS19-42 that averages 1.268 g/t Au over a 252.0 m intercept. The system appears to be gaining strength to the northeast as the depth is now showing to exceed 700m, with an average of 0.683 g/t Au over 780 meters of vertical intercept. The mineralized horizon appears to be near flat-lying with excellent grade consistency between holes along the upper horizon. Exploration efforts will attempt to extend the zone further to the northeast with yet another 150m NE step-out hole from GS19-42.\"\n\n\n \nThe following table provides gold composites from the Goldstorm Zone in the first three 2019 drill holes completed:\n\n\n \nTable I: Gold Composites for GS19-42, 41 and 40\n\n \n\nSECTION\n\n\n\n\nHOLE ID\n\n\n\n\nFROM M\n\n\n\n\nTO M\n\n\n\n\nInterval (M)\n\n\n\n\nGOLD (gpt)\n\n\n\n\n112+50NE\n\n\n\n\nGS19-42\n\n\n\n\n63.5\n\n\n\n\n843.5\n\n\n\n\n780\n\n\n\n\n0.683\n\n\n \n\n\nincluding\n\n\n\n\n63.5\n\n\n\n\n315.5\n\n\n\n\n252\n\n\n\n\n1.268\n\n\n \n\n\nincluding\n\n\n\n\n63.5\n\n\n\n\n434\n\n\n\n\n370.5\n\n\n\...

More updates from Teuton Resources Corp.