Business
Teuton Reports Further Long Intervals of Gold Mineralization in Fifth Set of Drill Holes at Treaty Creek Property, Golden Triangle, BC
(TheNewswire) Hole Gs-20-94 Intersects 1.215 Gpt Aueq Over 354.0 Meters Within 1225.5...

About this update from Teuton Resources Corp.
[{"type":"text","content":"Teuton Reports Further Long Intervals of Gold Mineralization in Fifth Set of Drill Holes at Treaty Creek Property, Golden Triangle, BC\n \n \n (TheNewswire)\n \n \n \n Hole Gs-20-94 Intersects 1.215 Gpt\nAueq Over 354.0 Meters Within 1225.5 Meters Of 0.702 Gpt Aueq ;  Hole\nGs-20-83 Intersects 1.078 Gpt Aueq Over 345.0 Meters Within 921.0\nMeters Of 0.821 Gpt Aueq\n \n \n \n \n December 16, 2020 –\n \n \n TheNewswire -\n \n \n Vancouver, Canada – Teuton Resources\nCorp.  (“Teuton” or “the Company”) (\n \n \n TSXV:\n \n \n TUO)\n \n \n (OTC:TEUTF)\n \n \n (\n \n \n Frankfurt:\n \n \n TFE)\n \n \n has received a report from its joint venture partner Tudor\nGold containing results from the fifth set of holes drilled in the\nGoldstorm zone in 2020.  The Goldstorm has been the subject of an\nintense drilling program in 2020 and lies within the Treaty Creek\nproperty, situated\n \n \n in the heart of the Golden\nTriangle of northwestern British Columbia and on-trend from\nSeabridge’s KSM Project located five kilometers to the southwest.\n \n \n \n \n Results from 12 diamond drill holes were recently\nreceived from MSA Labs with final results from another 11 diamond\ndrill holes pending. All 12 holes have successfully intersected\n \n \n the Goldstorm System, expanding and defining the\nmineralization along the northeast and southeast axes, as well as to\ndepth. The Goldstorm System 300 Horizon has now been traced for 1100\nmeters along the northeast axis and, as well, the CS-600 and DS-5\nzones have been expanded to the northeast and to depth.  All 39 drill\nholes completed at Goldstorm during the 2020 program have encountered\nsignificant precious metal mineralization. The 2020 Treaty Creek\nDiamond Drill Program was completed last week, and field personnel\nhave winterized the camp. The track-components of two track-mounted\ndiamond drills remain on site ready for start-up of the 2021\nexploration season.\n \n \n \n \n Tudor Gold’s Vice President of\nProject Development, Ken Konkin, P.Geo., stated:\n \n \n “We are very pleased with the results obtained from all 39 drill\nholes completed this year to-date and we anticipate the release of the\nfinal 11 holes of the year within a few weeks. This brings the total\nto 50 drill holes that were completed thi...