Business
Scottie Resources Advances Direct-Ship Ore Strategy with Phase 2 Ore Sorting Study Success and Feasibility Study Launch
Vancouver, British Columbia--(Newsfile Corp. - March 18, 2026) - Scottie Resources Corp. (TSXV: SCOT) (OTCQB: SCTSF) (FSE: SR80) ("Scottie" or the "Company") is pleased to announce that following the release of its successful Preliminary Economic Assessment ("PEA"), it has selected Tetra Tech Inc. ("Tetra Tech") to lead the study work for a Feasibility Study ("FS") on its on its 100% owned Scottie Gold Mine Project (Bird et al., October 28, 2025, Scottie Gold Mine Project, SEDAR+). Scottie is...
About this update from Tetra Tech, Inc.
[{"type":"text","content":"Vancouver, British Columbia--(Newsfile Corp. - March 18, 2026) - Scottie Resources Corp. (TSXV: SCOT) (OTCQB: SCTSF) (FSE: SR80) ("Scottie" or the "Company") is pleased to announce that following the release of its successful Preliminary Economic Assessment ("PEA"), it has selected Tetra Tech Inc. ("Tetra Tech") to lead the study work for a Feasibility Study ("FS") on its on its 100% owned Scottie Gold Mine Project (Bird et al., October 28, 2025, Scottie Gold Mine Project, SEDAR+). Scottie is also pleased to report that results of its Phase 2 Ore Sorting Study confirmed positive Phase 1 results. Using production-level equipment and sample volumes as compared with Phase 1, these Phase 2 results provide a strong level of confidence in the use of DSO in this production scenario.","length":841,"tagName":"p"},{"type":"text","content":"The Company is targeting completion of the FS in Q2 2027, evaluating a high-margin Direct-Ship Ore ("DSO") operation designed to produce a gold-bearing concentrate for shipment to Asian smelters. By incorporating ore sorting and the DSO mine plan, the project aims to eliminate the need for a conventional gold processing plant and tailings facility, significantly reducing capital costs while maintaining a small environmental footprint. The development plan, consistent with the previously released PEA, envisions initial production from a shallow open pit at the Blueberry Zone, followed by underground mining from both Blueberry and the historic Scottie Gold Mine.","length":678,"tagName":"p"},{"type":"text","content":"Ore Sorting Highlights:","length":23,"tagName":"p"},{"type":"list","items":[{"val":[{"type":"text","content":"Phase 2 study results are consistent with Phase 1 study, demonstrating strong upgrade of all zones within the Scottie Gold Mine Project (SGMP).","length":143,"tagName":"p"}]},{"val":[{"type":"text","content":"X X-Ray Transmittance (XRT) recovery curves show an advantage over X-Ray Fluorescence (XRF) curves at the optimal operating range of 50% to 65% mass pull to sorter product (35% to 55% mass rejection).","length":200,"tagName":"p"},{"type":"list","items":[{"val":[{"type":"text","content":"XRT has been selected for the Feasibility Study.","length":48,"tagName":"p"}]}],"tagName":"ul","bulletedList":true,"length":48,"olTy...