Business
TDG Gold Corp. Intercepts 14.2 Metres of 3.55 g/t Gold Equivalent West of the Creek Zone, at the Shasta Project, Toodoggone District, B.C.
WHITE ROCK, BC / ACCESSWIRE / March 28, 2022 / TDG Gold Corp. (TSXV:TDG) (the "Company" or "T...

About this update from Tdg Gold Corp
[{"type":"text","content":"TDG Gold Corp. Intercepts 14.2 Metres of 3.55 g/t Gold Equivalent West of the Creek Zone, at the Shasta Project, Toodoggone District, B.C.WHITE ROCK, BC / ACCESSWIRE / March 28, 2022 / TDG Gold Corp. (TSXV:TDG) (the \"Company\" or \"TDG\") is pleased to report results from four diamond drillholes (Figure 1) completed in the Creek and JM Zones at TDG's 100% owned, former producing Shasta gold-silver (\"Au-Ag\") project in the Toodoggone District, B.C.DDH SH21-037 intersected: 26.2 metres (\"m\") of 1.81 grams per tonne (\"g/t\") gold and 24 g/t silver;Including, 14.2 m of 3.10 g/t Au and 37 g/t Ag [3.55 g/t AuEq*] from 127.3 m to 141.5 mThe four results presented in this news release are a combination of infill holes to validate historical gold and silver grades to contribute to a NI 43-101 Mineral Resource Estimate targeted for Q2 2022 and as peripheral step-outs to the known Shasta mineralization.SH21-034 and SH21-037 (Figure 2) were designed to test continuity of mineralization west of SH21-007 and SH21-008 (see TDG News Release January 11, 2022) and demonstrate Au-Ag mineralization in an under-tested northern area of the Shasta system (Table 1).SH21-031 (Figure 3) was designed as a western step-out of the known Mineralized Target Zone and is further evidence of a ‘mineralized halo' that extends distal from known high-grade mineralized zones within the Shasta system (See TDG News Release February 22, 2022). SH21-032 (Figure 3) was drilled to test for mineralization central to the Shasta system between the high-grade Creek Zone to the west and the JM Zone1 to the east (Figure 1). SH21-032 returned a broad intercept of 121.9 m of 0.34 g/t Au and 15 g/t Ag, confirming low-grade Au-Ag between the two high-grade mineralized structures (Image 1).1The JM Zone is best visualized as the surface trace of the NW-SE striking historical mine workings. Geological modelling of the JM Structure is underway, utilizing oriented core data from 2021 in addition to comprehensive assay and geological logging efforts.Image 1. Mineralization Encountered in Drillhole SH21-032 from 90.54 - 96.63 m; Calculated composite (absolute, no cut off) through 91.3 to 95.5 m (4.2m) 0.32 g/t Au and 32 g/t Ag [0.72 g/t AuEq*].Figure 1. Plan Map of the JM/Creek Zone(s)Other key intercepts in the 2021 drilling are summarised in Table 1. Drill results for remai...