Business

Taseko Announces Strong Fourth Quarter Financial Results and Commencement of Copper Production at Florence Copper

Taseko's Florence Copper Wellfield Wellfield at Florence Copper site Annual Total Operating Costs (C1)* (US$ per pound of copper produced) Annual Total Operating Costs (C1)* (US$ per pound of copper produced) Fourth Quarter Total Operating Costs (C1)* (US$ per pound of copper produced) Fourth Quarter Total Operating Costs (C1)* (US$ per pound of copper produced) VANCOUVER, British Columbia, Feb. 18, 2026 (GLOBE NEWSWIRE) -- Taseko Mines Limited (TSX: TKO; NYSE American: TGB; LSE: TKO) ("Taseko"

articleTaseko Mines LimitedFebruary 18, 202646/company/taseko-mines-ltd/news/taseko-announces-strong-fourth-quarter-financial-results-and-commencement-of-copper-production-at-florence-copper
Taseko Announces Strong Fourth Quarter Financial Results and Commencement of Copper Production at Florence Copper

About this update from Taseko Mines Limited

[{"type":"image","alt":"Taseko Mines Limited","displaySize":"","headline":null,"caption":"Taseko Mines Limited","className":"","disableSlideshowImg":false,"size":{"original":{"width":300,"height":68,"url":"https://media.zenfs.com/en/globenewswire.com/b6b3007504ca2d7471ef2f80fd1bb36f"},"resized":{"url":"https://s.yimg.com/ny/api/res/1.2/VqVyRX3xyvJsDm.hohb8Tw--/YXBwaWQ9aGlnaGxhbmRlcjt3PTQyMDtoPTk1O2NmPXdlYnA-/https://media.zenfs.com/en/globenewswire.com/b6b3007504ca2d7471ef2f80fd1bb36f","width":300,"height":68}},"lazy":false},{"type":"text","content":"Taseko's Florence Copper Wellfield","length":38,"tagName":"p"},{"type":"image","alt":"Wellfield at Florence Copper site","displaySize":"","headline":null,"caption":"Wellfield at Florence Copper site","credit":"GlobeNewswire Inc.","className":"","disableSlideshowImg":false,"size":{"original":{"width":5280,"height":3956,"url":"https://media.zenfs.com/en/globenewswire.com/148d8e3c8a16b47968a956d37484f2b2"},"resized":{"url":"https://s.yimg.com/ny/api/res/1.2/uKJMEpMmkCRcJZCTFA_Z8Q--/YXBwaWQ9aGlnaGxhbmRlcjt3PTk2MDtoPTcxOTtjZj13ZWJw/https://media.zenfs.com/en/globenewswire.com/148d8e3c8a16b47968a956d37484f2b2","width":960,"height":719},"lightbox":{"url":"https://s.yimg.com/ny/api/res/1.2/v8J3LuQ4oP6c4hVoRQIK0Q--/YXBwaWQ9aGlnaGxhbmRlcjt3PTI0MDA7aD0xNzk4O2NmPXdlYnA-/https://media.zenfs.com/en/globenewswire.com/148d8e3c8a16b47968a956d37484f2b2","width":1200,"height":899}}},{"type":"text","content":"Annual Total Operating Costs (C1)* (US$ per pound of copper produced)","length":69,"tagName":"p"},{"type":"image","alt":"Annual Total Operating Costs (C1)* (US$ per pound of copper produced)","displaySize":"","headline":null,"caption":"Annual Total Operating Costs (C1)* (US$ per pound of copper produced)","credit":"GlobeNewswire Inc.","className":"","disableSlideshowImg":false,"size":{"original":{"width":648,"height":170,"url":"https://media.zenfs.com/en/globenewswire.com/4088031bb24c9551a3416fa0183b7ad6"},"resized":{"url":"https://s.yimg.com/ny/api/res/1.2/7NlHAEG6N7qbTjvuAQwvpg--/YXBwaWQ9aGlnaGxhbmRlcjt3PTk2MDtoPTI1MjtjZj13ZWJw/https://media.zenfs.com/en/globenewswire.com/4088031bb24c9551a3416fa0183b7ad6","width":648,"height":170}}},{"type":"text","content":"Fourth Quarter Total Operating Costs (C1)* (US$ per pound of copper produced)","length":77,"tagName":"p"},{"type":"image","alt":"Fourth Quarter Total Operating Co...

More updates from Taseko Mines Limited

Operating Costsoperating costsGibraltarFlorence CopperCopperoperating costcopper productionGibraltarcopper cathodecopper cathode