Business

Taranis Resources Intersects 1.26 g/t Au, 274 g/t Ag, 0.19% Cu, 6.51% Pb & 6.89% Zn Over 3.44 m in True Fissure Zone

Taranis Resources Intersects 1.26 g/t Au, 274 g/t Ag, 0.19% Cu, 6.51% Pb & 6.89% Zn Over 3.44 m in True Fissure Zone.

articleTaranis Resources Inc.September 5, 20074/company/taranis-resources-inc/news/taranis-resources-intersects-126-gt-au-274-gt-ag-019percent-cu-651percent-pb-and-689percent-zn-over-344-m-in-true-fissure-zone
Taranis Resources Intersects 1.26 g/t Au, 274 g/t Ag, 0.19% Cu, 6.51% Pb & 6.89% Zn Over 3.44 m in True Fissure Zone

About this update from Taranis Resources Inc.

[{"type":"text","content":"\n\n\n\nLAKEWOOD, CO, Sept. 5 /CNW/ - Taranis Resources Inc. ("Taranis") (TSX.V:\nTRO), a Colorado-based resource company with a number of gold and silver\nprojects in Nevada, British Columbia and Finland, is pleased to provide an\nupdate of its ongoing exploration activities on the Thor Property, British\nColumbia.\n\n\nTaranis has completed a total of 50 drill holes (2,740 m) in the True\nFissure Zone ("TFZ") drilled on a systematic grid for over 300 m strike\nlength, although only drill results are available for 10 drill holes at this\ntime. Precious and base-metal mineralization occurs within a laterally\npersistent massive sulphide horizon that has been subject to intense\nhydrothermal alteration and folding.\n\n\nTaranis owns a 100% interest in the Thor Property which was acquired in\n2006 after a due-diligence that demonstrated significant precious and\nbase-metal mineralization over a strike length of 1.4 km (News Release dated\n11/16/2006). The limited diamond drilling reported in this News Release\npertains only to only the TFZ, and at least 4 other zones are known at Thor.\n\n\nContemporaneous with diamond drilling on the TFZ, Taranis has undertaken\na series of geophysical and geological surveys aimed at locating other targets\noutside of the known gold/base metal bearing lodes. Initial drilling has been\nfocused on the TFZ in order to delineate and understand the complicated\ngeology of the property. Drill Holes were drilled westerly from multiple drill\npads normal to strike and dip of the TFZ, and as such the intercepts\napproximate the true thickness of the TFZ.\n\n\nSection 0m North\n\n\nDrill Hole Thor-1 (-45 degrees) was drilled 50m east of the True Fissure\nOpen Pit and intersected a thin gold-bearing zone that corresponds to the\nupper edge of the TFZ.\n\n\nFrom To Au Ag Cu Pb Zn Thickness\n (m) (m) (g/t) (g/t) (%) (%) (%) (m)\n-------------------------------------------------------------------------\n34.38 34.66 3.04 7.80 0.01 0.03 0.01 0.27\n-------------------------------------------------------------------------\n\nDrill Hole Thor-2 (-65 degrees) was drilled down from the same setup as\nThor-1 dip and intersected the TFZ down dip of Thor-1.\n\nFrom To Au Ag Cu Pb Zn Thickness\n (m) (m) (g/t) (g/t) (%) (%) (%) (m)\n-----------------------------------------------------------------------...

More updates from Taranis Resources Inc.