Business

Taranis Intersects 4.54% Zn, 2.83% Pb, 0.21% Cu, 1.31 g/t Au and 176.17 g/t Ag over 1.71 m in North Extension of True Fissure Zone - 3.80% Zn, 13.83% Pb, 0.40% Cu, 5.49 g/t Au and 577.09 g/t Ag Over 0.52 m in South Extension of True Fissure Zone

Lakewood, CO, Jan. 24 /CNW/ - Taranis Resources Inc. ("Taranis") (TSX.V: TRO) is pleased to prese...

articleTaranis Resources Inc.January 24, 20084/company/taranis-resources-inc/news/taranis-intersects-454percent-zn-283percent-pb-021percent-cu-131-gt-au-and-17617-gt-ag-over-171-m-in-north-extension-of-true-fissure-zone-380percent-zn-1383percent-pb-040percent-cu-549-gt-au-and-57709-gt-ag-over-052-m-in-south-extension-of-true-fissure-zone
Taranis Intersects 4.54% Zn, 2.83% Pb, 0.21% Cu, 1.31 g/t Au and 176.17 g/t Ag over 1.71 m in North Extension of True Fissure Zone - 3.80% Zn, 13.83% Pb, 0.40% Cu, 5.49 g/t Au and 577.09 g/t Ag Over 0.52 m in South Extension of True Fissure Zone

About this update from Taranis Resources Inc.

[{"type":"text","content":"\n\n\n\nLakewood, CO, Jan. 24 /CNW/ - Taranis Resources Inc. ("Taranis") (TSX.V:\nTRO) is pleased to present further drill results from its Thor Property. The\ndrill results pertain to the south and north extensions of the True Fissure\nZone ("TFZ") where a number of ore-grade intercepts were previously reported.\n\n\n True Fissure Zone\n\nTwenty-nine drill holes have penetrated the TFZ, and Thor-12, 13 and 22\nare the last holes to be reported from the 2007 drilling campaign. The TFZ has\nbeen drilled on 40 m centers and has a number of pre-existing exploration\ndrifts that have been channel sampled by previous operators. Taranis has not\nreported on the previous channel samples, but they are deemed to be highly\nreliable and corroborate the Taranis drill results.\n\nSection 120m North\n\nDrill Hole Thor-12 (-45 degrees) was drilled down-dip of drill hole\nThor-11 which previously intersected 1.09 g/t Au, 104.04 g/t Ag, 0.13% Cu,\n2.05% Pb and 2.41% Zn / 6.10 m (see News Release dated September 5, 2007).\n\n-------------------------------------------------------------------------\n Thor-12\n-------------------------------------------------------------------------\n From To Au Ag Cu Pb Zn Thickness\n (m) (m) (g/t) (g/t) (%) (%) (%) (m)\n-------------------------------------------------------------------------\n 13.41 16.46 0.49 82.09 0.06 0.40 4.89 3.05\n-------------------------------------------------------------------------\n\nDrill Hole Thor-13 (-65 degrees) was drilled down-dip of Thor-12 from the\nsame setup and intersected the downward continuation of the intercept\nencountered in drill hole Thor-12.\n\n-------------------------------------------------------------------------\n Thor-13\n-------------------------------------------------------------------------\n From To Au Ag Cu Pb Zn Thickness\n (m) (m) (g/t) (g/t) (%) (%) (%) (m)\n-------------------------------------------------------------------------\n 14.57 16.28 1.31 176.17 0.21 2.83 4.54 1.71\n-------------------------------------------------------------------------\n\n\nSection 80m North\n\nDrill Hole Thor-22 (-45 degrees) was drilled down-dip of drill holes\nThor-9, 10 and 11 (see News Release dated September 5, 2007) and intersected\nthe TFZ. The intercept has a prevalent fault in the hangingwall and indicates\nthat the TFZ has likely been di...

More updates from Taranis Resources Inc.