Business
US EV Battery Supply Chain: Talon Metals Announces New High Grade Nickel-Copper Mineralization at the Tamarack Nickel Project
13 New Drill Holes Show Prospective Grades and Size Outside Main Resource Area Tamarack, Minn...

About this update from Talon Metals Corp.
[{"type":"text","content":"US EV Battery Supply Chain: Talon Metals Announces New High Grade Nickel-Copper Mineralization at the Tamarack Nickel Project13 New Drill Holes Show Prospective Grades and Size Outside Main Resource AreaTamarack, Minnesota and Tortola, British Virgin Islands--(Newsfile Corp. - October 5, 2021) - Talon Metals Corp. (TSX: TLO) (\"Talon\" or the \"Company\") is pleased to provide an update on drill results from the Tamarack Nickel-Copper-Cobalt Project (\"Tamarack Nickel Project\"), located in Minnesota, USA.Figure 1: Drill hole 21TK0311 assayed 3.50% Ni, 1.40% Cu (4.38% NiEq, 11.68% CuEq) over 4.35 meters starting at only 234.5 meters depth.To view an enhanced version of Figure 1, please visit:https://orders.newsfilecorp.com/files/2443/98578_091c080e9408682b_001full.jpgHIGHLIGHTSTalon reports assays from thirteen (13) new drill holes in the CGO East area, located outside of the Tamarack Nickel Project's main resource area. These new assays demonstrate high nickel and copper grades across a large area in the CGO East area with these holes testing an area approximately 430 meters long (north-south). The assays also demonstrate significant thickness of the mineralized intervals and are expected to add meaningful volume to future resource estimates.Some of the notable assay results, include:Drill hole 21TK0305 intersected 17.95 meters of nickel-copper mineralization grading 0.7% Ni, 0.44% Cu (0.96% NiEq1 or 2.55% CuEq2) starting at only 199.5 meters depth;Drill hole 21TK0306 intersected 15.94 meters of nickel-copper mineralization grading 0.77% Ni, 0.41% Cu (1.09% NiEq or 2.9% CuEq) starting at only 240.3 meters depth;Drill hole 21TK0309 intersected 2.58 meters of mixed and massive nickel-copper mineralization grading 4.26% Ni, 1.89% Cu (5.25% NiEq or 13.99% CuEq) starting at only 248.18 meters depth; andDrill hole 21TK0311 intersected 4.35 meters of mixed and massive nickel-copper mineralization grading 3.50% Ni, 1.40% Cu (4.38% NiEq, 11.68% CuEq) starting at only 234.5 meters depth.\"We are extremely pleased with the assay results announced today from the CGO East area, which sits outside of the Tamarack Nickel Project's defined resource area,\" said Brian Goldner, Vice President of Exploration. \"This new drilling has demonstrated over 600 meters of continuous high-grade nickel copper sulphide mineralization, with potential to...