Business
Talon Metals Makes Exceptional Massive Sulphide Discovery at Tamarack During Feasibility Study Drilling
Discovery coincides with the announcement of the Administration's Executive Order: "Immediate Mea...

About this update from Talon Metals Corp.
[{"type":"text","content":"Talon Metals Makes Exceptional Massive Sulphide Discovery at Tamarack During Feasibility Study DrillingDiscovery coincides with the announcement of the Administration's Executive Order: \"Immediate Measures to Increase American Mineral Production\"Tamarack, Minnesota--(Newsfile Corp. - March 26, 2025) - Talon Metals Corp. (TSX: TLO) (OTC Pink: TLOFF) (together with its subsidiaries, \"Talon\" or the \"Company\"), the majority owner and operator of the Tamarack Nickel-Copper-Cobalt Project (\"Tamarack Nickel Copper Project\") in central Minnesota and the operator of the Boulderdash nickel copper discovery and numerous high-grade nickel-copper prospects in the Upper Peninsula of Michigan, is pleased to announce a significant massive sulphide intercept measuring over 8.25 meters at the Tamarack Nickel Copper Project.Figure 1: Photo of drill core from the extension of drill hole 16TK0250 at 707.75 meters depth showing 8.25 meters of massive sulphide To view an enhanced version of this graphic, please visit:https://images.newsfilecorp.com/files/2443/246253_talon_fig1.jpgHighlights:Since Talon's press release dated February 3, 2025, Talon's in-house exploration team has been 'Infilling' and 'Outfilling' the Tamarack Resource Area for purposes of completing a feasibility study at the Tamarack Nickel Copper Project. This work is in support of Talon's Proposed Action (a highly detailed project description) in its Environmental Assessment Worksheet to support the preparation of an Environmental Impact Statement. Historic drill hole 16TK0250 was re-examined and extended from 649m depth in order to evaluate a subtle Borehole Electromagnetic (\"EM\") response observed in the data.The drill hole encountered significant mineralization at a depth of 707.75 meters, drilling 8.25 meters that was logged as 95% sulphide content (the higher the percentage of sulphide, the higher the grade of nickel at the Tamarack Nickel Copper Project). Notably, the intercept is located approximately 150 meters below and 50 meters south of the known massive nickel-copper mineralization within the Tamarack Resource Area, where drill hole 13TK0171 intercepted 7.74m of massive sulphide assaying 8.01% Ni, 2.87% Cu, 1.16 ppm Pd+Pt+Au or 9.51% NiEq (see the November 2022 Technical Report for further technical information). The percentage of sulphide content logged over t...