Business
Talon Metals Intercepts High-Grade Nickel-Copper Mineralization in 14 New Holes Located Outside of the Tamarack Nickel Project Resource
Tamarack, Minnesota--(Newsfile Corp. - November 16, 2023) - Talon Metals Corp. (TSX: TLO) (OTC Pi...

About this update from Talon Metals Corp.
[{"type":"text","content":"Talon Metals Intercepts High-Grade Nickel-Copper Mineralization in 14 New Holes Located Outside of the Tamarack Nickel Project ResourceTamarack, Minnesota--(Newsfile Corp. - November 16, 2023) - Talon Metals Corp. (TSX: TLO) (OTC Pink:TLOFF) (\"Talon\" or the \"Company\"), the majority owner and operator of the Tamarack Nickel-Copper-Cobalt Project (\"Tamarack Nickel Project\") in central Minnesota, today reports new holes drilled at the Tamarack Nickel Project, with numerous massive sulphide intercepts outside the Tamarack Nickel Project's resource.Figure 1: Drill core from drill hole 22TK0424 showing 10.49 meters of massive sulphide assaying 6.22% Ni located outside the Tamarack Nickel Project resource (near the CGO West area).To view an enhanced version of this graphic, please visit:https://images.newsfilecorp.com/files/2443/187549_2b7651ed446a6889_001full.jpgHighlightsTalon is releasing results from 116 new drill holes at the Tamarack Nickel Project, of which 20 are exploration holes drilled with the goal of expanding the resource at the Tamarack Nickel Project, while 96 are geotechnical holes that were drilled to support engineering work for a future mine and rail access at the Tamarack Nickel Project. 14 of the 20 exploration drill holes intersected high-grade nickel-copper mineralization outside of the Tamarack Nickel Project's resource (13 holes with assays released today and 7 holes with assays still pending) (see Table 3, Table 4 and Figure 2).The Tamarack Nickel Project continues to show significant high-grade nickel-copper growth potential with multiple areas still open to expansion.Some notable drill holes: Proximate to the CGO East area, two drill holes (22TK0431 and 22TK0435) intersected 4.54 meters of 4.63% NiEq and 3.25 meters of 3.56% NiEq, respectively, of high-grade massive sulphides approximately 75 meters down strike from the Tamarack Nickel Project resource (see CGO East mineralized envelope in Figure 3). Of note, the 4.54 meter intercept of high-grade massive sulphides contained in drill hole 22TK0431 ties the Tamarack Nickel Project's record for the longest high-grade massive sulphide interval in the CGO East area to date.In the CGO West area, drill holes 22TK0421 and 22TK0424 intersected 8.5 meters of 8.05% NiEq and 10.49 meters of 7.97% NiEq, respectively, of high-grade massive sulphides outside of the...