Business

Talon Metals Drills 8.39 Meters (27.53 Feet) of High-grade Massive Sulphides at the Tamarack Project to Extend Mineralization

Road Town, Tortola, British Virgin Islands--(Newsfile Corp. - November 24, 2020) - Talon Me...

articleTalon Metals Corp.November 24, 20205/company/talon-metals-corp/news/talon-metals-drills-839-meters-2753-feet-of-high-grade-massive-sulphides-at-the-tamarack-project-to-extend-mineralization
Talon Metals Drills 8.39 Meters (27.53 Feet) of High-grade Massive Sulphides at the Tamarack Project to Extend Mineralization

About this update from Talon Metals Corp.

[{"type":"text","content":"Talon Metals Drills 8.39 Meters (27.53 Feet) of High-grade Massive Sulphides at the Tamarack Project to Extend MineralizationRoad Town, Tortola, British Virgin Islands--(Newsfile Corp. - November 24, 2020) - Talon Metals Corp. (TSX: TLO) (\"Talon\" or the \"Company\") is pleased to provide an update on the Tamarack Nickel-Copper-Cobalt Project (\"Tamarack Project\"), located in Minnesota, USA. The Tamarack Project comprises the Tamarack North Project and the Tamarack South Project. Figure 1: Massive Sulphide Mineralization Starting at 414.73 meters (Drill hole 20TK0273) To view an enhanced version of Figure 1, please visit:https://orders.newsfilecorp.com/files/2443/68808_34533b2534cfb878_001full.jpgHIGHLIGHTS Drill hole 20TK0273 intersected 8.39 meters (27.53 feet) of high-grade massive sulphide mineralization starting at 414.73 meters as shown in Figures 1 and 2 (assays pending). Drill hole 20TK0273 was targeting a geophysical (BHEM) anomaly that was refined during the recent resurveying of historic drill hole 15TK0219. Results indicate an extension of mineralization to the north of historic intercepts of thick mineralization. \"We are excited by the results from this latest drill hole,\" said Brian Goldner, Head of Exploration. \"The recent geophysical program that focused on running Borehole Electro-Magnetic surveys down existing boreholes has helped to refine off-hole anomalies into exciting new targets. The eastern limb of the high-grade Massive Sulphide Unit at the Tamarack Project has thick massive sulphide intercepts at both the north and south ends of the limb, but the middle had previously only produced thinner intercepts in historical drilling. With our high resolution BHEM we are able to show that the historic holes with thin intercepts in this zone have off-hole BHEM anomalies like the one drilled in 20TK0273, suggesting that there may be additional thick intercepts.\"SUMMARY Talon has continued the ongoing drill program at the Tamarack Project with three recent drill holes (see Figure 3 below) focusing on expanding the high-grade massive sulphide mineralization from the current resource area (see Figure 6 for a summary of the Company's current resource). The recent geophysical program focused on running high resolution BHEM surveys with Talon's internal geophysical crew. Hole 15TK0219 was one of these holes that wa...

More updates from Talon Metals Corp.