Business
Talon Metals Consistently Intersects Nickel-Copper Mineralization in a New Zone Outside of the Tamarack Nickel Project Resource Area
Road Town, Tortola, British Virgin Islands--(Newsfile Corp. - March 31, 2021) - Talon Metals C...

About this update from Talon Metals Corp.
[{"type":"text","content":"Talon Metals Consistently Intersects Nickel-Copper Mineralization in a New Zone Outside of the Tamarack Nickel Project Resource AreaRoad Town, Tortola, British Virgin Islands--(Newsfile Corp. - March 31, 2021) - Talon Metals Corp. (TSX: TLO) (\"Talon\" or the \"Company\") is pleased to provide an update on the Tamarack Nickel-Copper-Cobalt Project (\"Tamarack Nickel Project\"), located in Minnesota, USA. The Tamarack Nickel Project comprises the Tamarack North Project and the Tamarack South Project. Figure 1: 5.1 Meters (16.7 feet) of Mixed Massive Sulphide Mineralization starting at 171.26 meters (Drill Hole 21TK0283).To view an enhanced version of Figure 1, please visit:https://orders.newsfilecorp.com/files/2443/78996_9b642679140bc83a_001full.jpgHIGHLIGHTSTalon has consistently intersected massive sulphide mineralization at shallow depths in a new area that extends to approximately 700 meters north-east of the Tamarack Nickel Project's resource area (known as CGO East). More specifically:Drill hole 21TK0283 intersected 34.34 meters (112.6 feet) of nickel-copper mineralization starting at 142 meters, including 5.1 meters (16.7 feet) of mixed and massive sulphide mineralization starting at 171.26 meters;Drill hole 21TK0288 intersected 20.9 meters (68.6 feet) of nickel-copper mineralization starting at 148.6 meters, including 0.71 meters (2.3 feet) of mixed and massive sulphide starting at 168.79 meters;Drill hole 21TK0289 intersected 30.42 meters (99.8 feet) of nickel-copper mineralization starting at 181.52 meters, including 1.88 meters (6.2 feet) of mixed and massive sulphide mineralization starting at 210.06 meters;Drill hole 21TK0290 intersected 27.18 meters (89.1 feet) of nickel-copper mineralization starting at 151.79 meters, including 1.6 meters (5.2 feet) of mixed and massive sulphide mineralization starting at 183.13 meters;Drill hole 21TK0291 intersected 13.91 meters (45.6 feet) of nickel-copper mineralization starting at 210.61 meters, including 1.86 meters (6.1 feet) of mixed and massive sulphide mineralization starting at 183.13 meters;Drill hole 21TK0294 intersected 16.3 meters (53.5 feet) of nickel-copper mineralization starting at 213.9 meters, including 0.58 meters (1.9 feet) of mixed massive sulphide starting at 230.57 meters; Drill hole 21TK0295 intersected 25.01 meters (82.0 feet) of nickel-copper mineralizat...