Business

Talon Metals Reports New Assays and Step-Out Drilling Results

Drill hole 25TK0563B Intercepted 8.85 Meters of Mineralization Starting at 774.40 meters, Grading 9.60% Ni, 12.65% Cu, 0.09% Co, 11.44g/t Pd+Pt and 11.12 g/t Au (20.96% NiEq or 41.43% CuEq)Step-Out Drilling Further Confirms Massive Sulphide Continuity and Intercepts Mixed Massive Sulphides Approximately 79 Meters Below the Tamarack Resource AreaTamarack, Minnesota--(Newsfile Corp. - February 4, 2026) - Talon Metals Corp. (TSX: TLO) (OTCID: TLOFD) ("Talon" or the "Company") is pleased to report..

articleTalon International, Inc.February 4, 202616/company/talon-international-inc/news/talon-metals-reports-new-assays-and-step-out-drilling-results
Talon Metals Reports New Assays and Step-Out Drilling Results

About this update from Talon International, Inc.

[{"type":"text","content":"Drill hole 25TK0563B Intercepted 8.85 Meters of Mineralization Starting at 774.40 meters, Grading 9.60% Ni, 12.65% Cu, 0.09% Co, 11.44g/t Pd+Pt and 11.12 g/t Au (20.96% NiEq or 41.43% CuEq)","length":189,"tagName":"p","attribs":{}},{"type":"text","content":"Step-Out Drilling Further Confirms Massive Sulphide Continuity and Intercepts Mixed Massive Sulphides Approximately 79 Meters Below the Tamarack Resource Area","length":158,"tagName":"p","attribs":{}},{"type":"text","content":"Tamarack, Minnesota--(Newsfile Corp. - February 4, 2026) - Talon Metals Corp. (TSX: TLO) (OTCID: TLOFD) ("Talon" or the "Company") is pleased to report successful step-out drill holes in the Vault Zone of the Tamarack Nickel-Copper-Cobalt Project in Minnesota (the "Tamarack Nickel-Copper Project"), as well as new assay results.","length":359,"tagName":"p"},{"type":"text","content":"Highlights","length":10,"tagName":"p"},{"type":"image","alt":"","displaySize":"","headline":null,"caption":"","className":"","disableSlideshowImg":false,"size":{"original":{"width":550,"height":318,"url":"https://media.zenfs.com/en/newsfile_64/0f7f7e9e677a68751b0bced6eb27363a"},"resized":{"url":"https://s.yimg.com/ny/api/res/1.2/fI1ULx.8KjdM1XozFEA16A--/YXBwaWQ9aGlnaGxhbmRlcjt3PTk2MDtoPTU1NTtjZj13ZWJw/https://media.zenfs.com/en/newsfile_64/0f7f7e9e677a68751b0bced6eb27363a","width":550,"height":318}},"href":"https://images.newsfilecorp.com/files/2443/282633_9468c00014578a4e_001full.jpg","hrefExternal":true,"rel":"nofollow"},{"type":"text","content":"Figure 1: Drill hole 25TK0563B, drilled 16 meters to the northwest of drill hole 25TK0563 intercepted 8.85 meters of Massive Sulphide Unit mineralization starting at 774.40 meters","length":179,"tagName":"p","attribs":{}},{"type":"text","content":"To view an enhanced version of this graphic, please visit:https://images.newsfilecorp.com/files/2443/282633_9468c00014578a4e_001full.jpg","length":137,"tagName":"p","attribs":{}},{"type":"text","content":"As outlined in the Company's June 5, 2025 press release, drill hole 25TK0563 intercepted a combined 34.9 meters of Massive Sulphide Unit ("MSU") mineralization grading 28.88% NiEq and 57.76% CuEq starting at 762.34 meters. Talon is pleased to report that drill hole 25TK0563B, drilled 16 meters to the northwest of drill hole 25TK0563, intercepte...

More updates from Talon International, Inc.

Talon Metals Corp.Drill holedrill holesTalonTamarackmineralizationMSU