Business

CORRECTION FROM SOURCE: Talon Metals Reports New Assays and Step-Out Drilling Results

Drill hole 25TK0563B Intercepted 8.85 Meters of Mineralization Starting at 774.40 meters, Grading 9.60% Ni, 12.65% Cu, 0.09% Co, 11.44g/t Pd+Pt and 11.12 g/t Au (20.96% NiEq or 41.43% CuEq)Step-Out Drilling Further Confirms Massive Sulphide Continuity and Intercepts Mixed Massive Sulphides Approximately 79 Meters Below the Tamarack Resource AreaThis release corrects and replaces the press release issued by Talon Metals Corp. on Feb 4, 2026 at 7:30 AM EST. In the first sub headline, the drill...

articleTalon International, Inc.February 4, 202616/company/talon-international-inc/news/correction-from-source-talon-metals-reports-new-assays-and-step-out-drilling-results
CORRECTION FROM SOURCE: Talon Metals Reports New Assays and Step-Out Drilling Results

About this update from Talon International, Inc.

[{"type":"text","content":"Drill hole 25TK0563B Intercepted 8.85 Meters of Mineralization Starting at 774.40 meters, Grading 9.60% Ni, 12.65% Cu, 0.09% Co, 11.44g/t Pd+Pt and 11.12 g/t Au (20.96% NiEq or 41.43% CuEq)","length":189,"tagName":"p","attribs":{}},{"type":"text","content":"Step-Out Drilling Further Confirms Massive Sulphide Continuity and Intercepts Mixed Massive Sulphides Approximately 79 Meters Below the Tamarack Resource Area","length":158,"tagName":"p","attribs":{}},{"type":"text","content":"This release corrects and replaces the press release issued by Talon Metals Corp. on Feb 4, 2026 at 7:30 AM EST. In the first sub headline, the drill hole number was stated incorrectly and has been corrected to read "Drill hole 25TK0563B". In addition, the drill hole number in the title to Table 1 was stated incorrectly and has been corrected to read "Assays for drill hole 25TK0563B".","length":407,"tagName":"p"},{"type":"text","content":"Tamarack, Minnesota--(Newsfile Corp. - February 4, 2026) - Talon Metals Corp. (TSX: TLO) (OTCID: TLOFD) ("Talon" or the "Company") is pleased to report successful step-out drill holes in the Vault Zone of the Tamarack Nickel-Copper-Cobalt Project in Minnesota (the "Tamarack Nickel-Copper Project"), as well as new assay results.","length":359,"tagName":"p"},{"type":"text","content":"Highlights","length":10,"tagName":"p"},{"type":"image","alt":"","displaySize":"","headline":null,"caption":"","className":"","disableSlideshowImg":false,"size":{"original":{"width":550,"height":318,"url":"https://media.zenfs.com/en/newsfile_64/12f042cbe151b6ea74b9917f90f9ec41"},"resized":{"url":"https://s.yimg.com/ny/api/res/1.2/a16eM2mpIMryFzvjG4lO4A--/YXBwaWQ9aGlnaGxhbmRlcjt3PTk2MDtoPTU1NTtjZj13ZWJw/https://media.zenfs.com/en/newsfile_64/12f042cbe151b6ea74b9917f90f9ec41","width":550,"height":318}},"href":"https://images.newsfilecorp.com/files/2443/282675_89c8787a0433cbd1_001full.jpg","hrefExternal":true,"rel":"nofollow"},{"type":"text","content":"Figure 1: Drill hole 25TK0563B, drilled 16 meters to the northwest of drill hole 25TK0563 intercepted 8.85 meters of Massive Sulphide Unit mineralization starting at 774.40 meters","length":179,"tagName":"p","attribs":{}},{"type":"text","content":"To view an enhanced version of this graphic, please visit:https://images.newsfilecorp.com/files/2443/2...

More updates from Talon International, Inc.

Talon Metals Corp.Drill holedrill holesTalonTamarackmineralizationMSU