World

The European Union supports Tallinna Sadam in establishing onshore power supply for cruise ships

The European Union approved funding for AS Tallinna Sadam (hereinafter: Tallinna Sadam) project PoTOPS (Port of Tallinn Onshore Power Supply), which aims to create onshore power supply for cruise ships at two quays in the Old City Port by 2030. The project, which will last more than three years, will include the construction of a power grid connection to the Elering main grid, a 110/10kV substation and onshore power supply infrastructure with connection equipment for cruise ships. The capacity o

articleTallinna Sadam AsDecember 15, 20252/company/tallinna-sadam-as/news/the-european-union-supports-tallinna-sadam-in-establishing-onshore-power-supply-for-cruise-ships
The European Union supports Tallinna Sadam in establishing onshore power supply for cruise ships

About this update from Tallinna Sadam As

[{"type":"image","alt":"AS Tallinna Sadam","displaySize":"","headline":null,"caption":"AS Tallinna Sadam","className":"","disableSlideshowImg":false,"size":{"original":{"width":300,"height":89,"url":"https://media.zenfs.com/en/globenewswire.com/74597173cd9f0264eacc5c1d1fc908b1"},"resized":{"url":"https://s.yimg.com/ny/api/res/1.2/4ZL3um_sZnmblorOtu0_NA--/YXBwaWQ9aGlnaGxhbmRlcjt3PTQyMDtoPTEyNTtjZj13ZWJw/https://media.zenfs.com/en/globenewswire.com/74597173cd9f0264eacc5c1d1fc908b1","width":300,"height":89}},"lazy":false},{"type":"text","content":"The European Union approved funding for AS Tallinna Sadam  (hereinafter: Tallinna Sadam) project PoTOPS (Port of Tallinn Onshore Power Supply), which aims to create onshore power supply for cruise ships at two quays in the Old City Port by 2030.","length":250,"tagName":"p"},{"type":"text","content":"The project, which will last more than three years, will include the construction of a power grid connection to the Elering main grid, a 110/10kV substation and onshore power supply infrastructure with connection equipment for cruise ships. The capacity of the substation will cover the need to supply two cruise ships with onshore power at quays no 26 and 27, as well as the needs of future hybrid and fully electric Ro-Pax ships. The estimated total cost of the PoTOPS project is 39.7 million euros and the amount up to 30% will be covered by the Connecting Europe Facility (CEF) Alternative Fuels Infrastructure measure (AFIF). The Council of Tallinna Sadam approved the investment, the planning and the works will begin as soon as possible.","length":744,"tagName":"p"},{"type":"text","content":"Valdo Kalm, the Chairman of the Board of Tallinna Sadam, emphasized that the establishment of onshore power supply is crucial for the sustainability of cruise shipping. “Cruise tourism is important for the business of Tallinna Sadam, but not only - it also creates jobs and economic value for the entire tourism sector. If we want cruise ships to visit Tallinn in the future, we have to be ready to offer them a modern and environmentally friendly onshore power solution by 2030,” said Kalm.","length":491,"tagName":"p"},{"type":"text","content":"The overall objective of Tallinna Sadam PoTOPS project contributes to the achievement of the European Green Deal goals and climate neutrality by 2050, based on the guidelines in Regulation (EU)...

More updates from Tallinna Sadam As

Tallinna Sadamcruise shipsThe European UnionPower Supplypower gridPort of Tallinn