Business

Talisker Intersects 22.60 g/t Gold Over 0.5m Within 1.55 g/t Gold over 36.95m of Near Surface Gold Mineralization in Charlotte Zone at the Bralorne Gold Project

TORONTO, ON / ACCESSWIRE / January 19, 2021 / Talisker Resources Ltd. ("Talisker" or the "...

articleTalisker Resources Ltd.January 19, 20213/company/talisker-resources-ltd/news/talisker-intersects-2260-gt-gold-over-05m-within-155-gt-gold-over-3695m-of-near-surface-gold-mineralization-in-charlotte-zone-at-the-bralorne-gold-project
Talisker Intersects 22.60 g/t Gold Over 0.5m Within 1.55 g/t Gold over 36.95m of Near Surface Gold Mineralization in Charlotte Zone at the Bralorne Gold Project

About this update from Talisker Resources Ltd.

[{"type":"text","content":"Talisker Intersects 22.60 g/t Gold Over 0.5m Within 1.55 g/t Gold over 36.95m of Near Surface Gold Mineralization in Charlotte Zone at the Bralorne Gold ProjectTORONTO, ON / ACCESSWIRE / January 19, 2021 / Talisker Resources Ltd. (\"Talisker\" or the \"Company\") (TSX:TSK)(OTCQX:TSKFF) is pleased to announce assay results from holes SB-2020-020, SB-2020-021 (partial results) and SB-2020-019 (final results) from its resource drill out drill program at the Bralorne Gold Project in British Columbia.Key Points:Drilling continues to demonstrate structural continuity of the recently identified close to surface Charlotte Zone, as well as extensions of the 51-vein target.Multiple intercepts further demonstrate the potential for Charlotte to host broader zones of near-surface gold mineralization.A previously unidentified vein was also intersected close to surface - its relationship to adjacent veins is yet to be determined.A total of 31 vein targets validated (on 14 known veins) and three new vein discoveries were confirmed in 2020 program.Talisker completed 21,547.95m of drilling in 2020. The Company recently announced an expansion of its drilling program adding an additional 50,000 metres for 2021. A total of 4,766 samples are awaiting assay at the lab.50,000m resource drilling program currently underway with four drill rigs on site.As of the end of 2020, Talisker has completed 21,547.95m of drilling at the Bralorne Gold Project, results of which continue to verify and prioritize the interpreted expansion and continuity of targeted vein corridors. A further 4,766 core samples are currently at the laboratory pending release. Today's results are highlighted by the intersection of a broad zone of near-surface gold mineralization in the recently identified Charlotte Zone which returned 22.60 g/t gold over 0.50m within 1.55 g/t gold over 36.95m. Importantly, this zone was intersected at a downhole depth of only 208m (Figure 1, 2, 3). With the validation drill program completed last year, drilling in 2021 is primarily focussed on infill drilling the validated vein corridors; however, the identification of broad zones of gold mineralization close to surface within the Charlotte, Empire and Knight Zones situated above high-grade vein corridors at depth will also continue to be assessed.Highlights include:SB-2020-02122.60 g/t gold over 0.50m, f...

More updates from Talisker Resources Ltd.