Business
Talisker Intersects 1 g/t Au over 116.25m within 0.56 g/t over 441.2m Confirming 1,100m Continuous Vertical Panel at Pioneer
TORONTO, ON / ACCESSWIRE / September 7, 2021 / Talisker Resources Ltd. (" Talisker " or th...

About this update from Talisker Resources Ltd.
[{"type":"text","content":"Talisker Intersects 1 g/t Au over 116.25m within 0.56 g/t over 441.2m Confirming 1,100m Continuous Vertical Panel at PioneerTORONTO, ON / ACCESSWIRE / September 7, 2021 / Talisker Resources Ltd. (\" Talisker \" or the \" Company \") ( TSX:TSK | OTCQX:TSKFF ) is pleased to announce results from drill holes SB-2021-048 and SB2021-055 at its 100% owned flagship Bralorne Gold Project. These holes are the fourth and fifth holes drilled by Talisker this year in the recently discovered bulk-tonnage mineralization at Pioneer, located 2 kilometres to the south-east of the Bralorne township. Talisker continues to drill high grade vein resource at Bralorne.Key Points:Hole SB-2021-048 intersected 1g/t over 116.25m within a larger intercept of 0.56g/t over 441.2mHole SB-2021-048 was drilled to test down-dip continunity from previously released hole SB-2021-040 that intercepted 1.02 g/t over 114.15m. Results released today extend continunity 600 metres down-dip from hole 40.Hole SB-2021-055 intersected 0.68 g/t over 51.50m including 0.80 g/t over 34.55m. Three voids were intercepted as part of this interval and correspond with stopes from previously mined veins.Hole SB-2021-055 was drilled to test the up-dip continunity of hole SB-2021-026 that intersected 1.17 g/t Au over 106.75m. Results released today extend continunity 130 m down-dip from hole 26.Combined, holes SB-2021-026, SB-2021-030, SB-2021-040, SB-2021-048 and SB-2021-055 confirm an 1,100m continuous vertical panel of mineralisation from surface.Stepout hole SB-2021-025, drilled 200 metres to the south-east of these holes is expected to be released to market shortly.Stepout hole SB-2021-063, drilled 200 metres to the north-west of these holes is completed and at the laboratory awaiting assay.\"The results from these holes confirm the consistency of the mineralization encountered at Pioneer over broad intervals,\" commented Terry Harbort, Chief Executive Officer of Talisker, who added, \"We are progressing aggressively with this new discovery drilling multiple 200m stepouts along the 3.2 kilometre strike length to the northwest to define the mineralized footprint at Pioneer.\"A total of 54,500 m have been drilled this year out of a planned and fully funded 100,000 metre diamond drill program. Since acquiring the Bralorne Gold Project, Talisker has completed 76,700 m of drilling. Five...