Business

Talisker Intercepts High Grade Results from Unexplored Historic Gap Between Bralorne an Pioneer Extending the 77 Vein

TORONTO, ON / ACCESSWIRE / November 22, 2021 / Talisker Resources Ltd. (" Talisker " or th...

articleTalisker Resources Ltd.November 22, 20213/company/talisker-resources-ltd/news/talisker-intercepts-high-grade-results-from-unexplored-historic-gap-between-bralorne-an-pioneer-extending-the-77-vein
Talisker Intercepts High Grade Results from Unexplored Historic Gap Between Bralorne an Pioneer Extending the 77 Vein

About this update from Talisker Resources Ltd.

[{"type":"text","content":"Talisker Intercepts High Grade Results from Unexplored Historic Gap Between Bralorne an Pioneer Extending the 77 VeinTORONTO, ON / ACCESSWIRE / November 22, 2021 / Talisker Resources Ltd. (\" Talisker \" or the \" Company \") (TSX:TSK)(OTCQX:TSKFF ) is pleased to announce high grade results from drill hole SB-2021-075 highlighted by 81.09 g/t Au over 1.25 metres on the 77 Vein at its 100% owned flagship Bralorne Gold Project.Key Points:The 77 Vein was intersected between 373.75-375.0 metres highlighted by 81.09 g/t Au over 1.25 metres.Hole SB-2021-075 increases the total intercepts on the 77 Vein to 11.The 77 Vein was the most productive and high grade vein on the Project, historically averaging 17.7g/t Au and was mined to a depth of 1.9 kilometres.The 52 Vein was intersected between 456.0 and 457.20 metres highlighted by 13.86 g/t Au over 1.20 metres.Hole SB-2021-075 increases the total intercepts on the 52 Vein to 11.The 52 Vein Splay was intersected between 474.55 and 475.55 metres, highlighted by 12.87 g/t Au over 1.0 metre.Two shallow zones of low grade bulk-tonnage were defined, returning 0.56 g/t Au over 51.5 metres (236.40 and 287.90 metres depth) and 0.43 g/t Au over 32.2 metres (325.30 and 357.50 metres depth).Terry Harbort, President and CEO of Talisker commented, \"Hole 075 demonstrates the excellent continuity of the 77 vein increasing the strike to 1,100 metres from historic workings.\"Six diamond drills and 1 RC drill are currently operating at the Bralorne Gold Project. A total of 77,150 metres consisting of 148 holes of a planned and fully funded 100,000 metre program has been drilled at the Project this year with a total of 97,464 metres (179 holes) since Talisker initiated drilling in February 2020. There are 54 holes consisting of 17,366 samples are currently at the assay laboratory and are expected to be received by the Company shortly.SB-2021-075 Hole DescriptionComplete results have been received for this hole.Located in the Bralorne East block and centrally located within the granitic intrusive.Intersected granitic intrusive from surface to 356 metres followed by diorite to 831 metres, then granitic intrusive to 925 metres followed by sheared ultramafic rocks within the Cadwallader fault to completion at 961.9 metres.Bulk mineralization related to the 51BFW Vein intersected from 236.40 to 287.90 metres.Bu...

More updates from Talisker Resources Ltd.