Business
Talisker Intercepts High Grade Gold on the 52 Vein Across 660 Metres of Strike Length
TORONTO, ON / ACCESSWIRE / January 25, 2022 / Talisker Resources Ltd. (" Talisker " or the "...

About this update from Talisker Resources Ltd.
[{"type":"text","content":"Talisker Intercepts High Grade Gold on the 52 Vein Across 660 Metres of Strike LengthTORONTO, ON / ACCESSWIRE / January 25, 2022 / Talisker Resources Ltd. (\"Talisker\" or the \"Company\") (TSX:TSK)(OTCQX:TSKFF) is pleased to announce high-grade results from multiple drill holes highlighted by 55.25 g/t Au over 1.3 metres (SB-2021-090) and 23.58 g/t Au over 1.80 metres within 5.26 g/t Au over 8.90 metres (SB-2021-087) on the 52 Vein at its 100% owned flagship Bralorne Gold Project.Key Points:The drill holes in this release are located within the Bralorne East Complex.All three drill holes in this release intersected the 52 vein over a 660-metre strike length.Hole SB-2021-090 intersected the 52 vein highlighted by 55.25 g/t Au over 1.30 metres and the J vein which intersected 10.10 g/t Au over 0.55 metres.SB-2021-087 intersected the 52 vein highlighted by 23.85 g/t Au over 1.80 metres within 5.26 g/t Au over 8.90 metres.Hole SB-2021-085 intersected the 52 vein highlighted by 14.13 g/t Au over 2.50 metres and a New vein highlighted by 7.59 g/t Au over 1.45 metres.The previous drilling on the 52 vein returned high-grade assays highlighted by hole SB-2021-069 which returned 10.09 g/t Au over 4.35 metres and SB-2021-030 which returned 19.95g/t Au over 1.00 metres.Terry Harbort, CEO of Talisker, commented, \"These three holes confirm high grade mineralization over a significant strike length, highlighting the extensive vein continunity known as one of the defining characteristics of the Bralorne deposit. We are very pleased with the consistency of the gold mineralization intercepted in this structure and see the 52 vein building to one of the important ore bodies of our upcoming resource.\"Six diamond drills and 1 RC drill are currently operating at Bralorne. A total of 104,162 metres (197 holes) has been completed since Talisker initiated drilling at the Project in February 2020. 26,365 samples are currently at the assay laboratory and are expected to be received by the Company shortly.Hole Descriptions:SB-2021-085Located in the Bralorne East Block and hosted in dioritic intrusiveNew vein intersected from 296.25 to 299.00 m52 vein intersected from 387.00 to 389.50 m hosting visible goldSB-2021-087Located in the Bralorne East Block and hosted in granitic intrusive51 BFW vein intersected from 298.50 to 300 m52 vein intersected from 495...