Business

TAG Oil Achieves First Oil Production in the Badr Oil Field, Western Desert, Egypt

TAG Oil Achieves First Oil Production in the Badr Oil Field, Western Desert, Egypt Cana...

articleTag Oil LtdMay 9, 20234/company/tag-oil-ltd/news/tag-oil-achieves-first-oil-production-in-the-badr-oil-field-western-desert-egypt
TAG Oil Achieves First Oil Production in the Badr Oil Field, Western Desert, Egypt

About this update from Tag Oil Ltd

[{"type":"text","content":"\n \n \n \n TAG Oil Achieves First Oil Production in the Badr Oil Field, Western Desert, Egypt\n \n \n /* Style Definitions */\nspan.prnews_span\n{\nfont-size:8pt;\nfont-family:\"Arial\";\ncolor:black;\n}\na.prnews_a\n{\ncolor:blue;\n}\nli.prnews_li\n{\nfont-size:8pt;\nfont-family:\"Arial\";\ncolor:black;\n}\np.prnews_p\n{\nfont-size:0.62em;\nfont-family:\"Arial\";\ncolor:black;\nmargin:0in;\n}\n \n \n \n \n \n \n Canada NewsWire\n \n \n \n \n \n \n VANCOUVER, BC\n \n \n ,\n \n \n May 9, 2023\n \n \n /CNW/ -\n \n TAG Oil Ltd.\n \n (TSXV:\n \n TAO\n \n ) (OTCQX:\n \n TAOIF\n \n ) (\"\n \n TAG Oil\n \n \" or the \"\n \n Company\n \n \") is pleased to announce the successful re-entry of the vertical well, BED 1-7, at the Badr Oil Field (\"BED-1\") in the Western Desert,\n \n Egypt\n \n . The Company perforated the Abu Roash \"F\" formation (\"ARF Formation\") and conducted a Diagnostic Fracture Injectivity Test (DFIT). The reservoir was further fracture stimulated with a large 110 tons sand treatment and pump schedule with positive response confirming reservoir models and projected performance.\n \n \n On flowback, the well unloaded to surface under natural flow and cleaned up approximately 40% of the injected fracture fluid with significant presence of 23\n \n 0\n \n API oil. Net cumulative oil produced during the short flowback was in excess of 500 barrels, which was connected to a flow-line to the BED-1 field's production facilities and onward into sales pipeline.\n \n \n The well was shut-in to remove the frac string, install 3.5\" production tubing string and down-hole Electric Submersible Pump (ESP) to achieve steady production at stabilized oil rates. The well is expected to be on production within the next few days and the Company expects to announce 30-day rates from the well in mid June.\n \n \n Data collected from the well along with geomechanical and 3D seismic review has enhanced our horizontal well design. Plans are underway to secure a drilling rig to drill the first horizontal well designed with a multi-stage fracture stimulation. All necessary permits have been secured and site construction is underway. The well is expected to spud next month.\n \n \n \n Toby Pierce\n \n , CEO of TAG Oil, commented, \"This activity is the first step to establish oil production from the ARF Formation, an oil rich source rock th...

More updates from Tag Oil Ltd