Business

T2 Metals Begins 2024 Drill Program at the Sherridon Copper-Zinc Project, Manitoba

Vancouver, British Columbia--(Newsfile Corp. - August 29, 2024) - T2 Metals Corp. (TSXV: TW...

articleT2 Metals CorpAugust 29, 20245/company/t2-metals-corp/news/t2-metals-begins-2024-drill-program-at-the-sherridon-copper-zinc-project-manitoba
T2 Metals Begins 2024 Drill Program at the Sherridon Copper-Zinc Project, Manitoba

About this update from T2 Metals Corp

[{"type":"text","content":"T2 Metals Begins 2024 Drill Program at the Sherridon Copper-Zinc Project, ManitobaVancouver, British Columbia--(Newsfile Corp. - August 29, 2024) - T2 Metals Corp. (TSXV: TWO) (OTCQB: TWOSF) (WKN: A2DR6E) (\"T2\" or the \"Company\") is pleased to announce commencement of core drilling at the Sherridon copper-gold project in the Flin Flon - Snow Lake District of west-central Manitoba. The designed drill program is fully funded, will include more than 20 holes across a range of prospect areas, and will be the largest exploration program at Sherridon for more than a decade.Sherridon is a high-grade volcanogenic massive sulphide (\"VMS\") project with a significant mining history and multiple copper-rich massive sulphide occurrences, in an infrastructure-rich location. Targets for the drilling include near surface gold mineralization at Cold Lake and Lost Lake, targets down plunge from previous intersections at Bob Lake, and new targets identified by the integration of geology and geophysics. Drilling has commenced in the Cold Lake/Lost Lake area, in follow up to the successful 2023 program. The program incorporates both summer/fall and winter components to take advantage of simplified access and limited disturbance when ground is frozen. The drill program is facilitated through excellent support from the local First Nations community, highlighted by the 2023 signing of an Exploration Agreement with the Kiciwapa Cree Nation, and the 2024 receipt of an award for reconciliation efforts from Manitoba Prospectors and Developers Association. We look forward to contributing to the Sherridon community through employment, skills development and investment during the drilling program. Key features of the Sherridon project include:High grade historic copper and zinc production from an orebody with approximately 2 km of strike extent. Production from the Sherritt Gordon mines totalled 7.74 million tonnes @ 2.46% Cu, 2.84% Zn, 0.6 g/t Au and 33 g/t Ag (Goetz & Froese, 1982; see press release dated January 31, 2022);Recent drilling results that intersected high grade gold in wall rock outside the copper-zinc massive sulphide including 4.50 m grading 29.2 g/t Au and 138.8 g/t Ag from 38.0m (see press release dated March 1st, 2024); Historical Mineral Resource Estimates* at the Cold Lake, Lost Lake, Bob and Jungle prospects for ...

More updates from T2 Metals Corp