Business
T1 Energy Secures 50MW Grid Allocation for Nordic Data Center Asset
Norway’s power grid operator has assigned 50MW to T1 Energy, enabling advancement of existing industrial facility into a world-class data centerAUSTIN, Texas and NEW YORK, March 18, 2026 (GLOBE NEWSWIRE) -- T1 Energy Inc. (NYSE: TE) (“T1,” “T1 Energy,” or the “Company”) today announced that Norway’s national grid operator, Statnett, has assigned 50MW of grid power to T1 Energy’s existing 926,000-square-foot industrial building in Mo i Rana. T1 remains in the interconnection queue for 396MW of po
About this update from T1 Energy Inc.
[{"type":"image","alt":"T1 Energy Inc.","displaySize":"","headline":null,"caption":"T1 Energy Inc.","className":"","disableSlideshowImg":false,"size":{"original":{"width":257,"height":89,"url":"https://media.zenfs.com/en/globenewswire.com/fbebe5b9d57cbf630987ebd718411685"},"resized":{"url":"https://s.yimg.com/ny/api/res/1.2/eJ7Biu5rkGOKZXYeTx1UIw--/YXBwaWQ9aGlnaGxhbmRlcjt3PTQyMDtoPTE0NTtjZj13ZWJw/https://media.zenfs.com/en/globenewswire.com/fbebe5b9d57cbf630987ebd718411685","width":257,"height":89}},"lazy":false},{"type":"text","content":"Norway’s power grid operator has assigned 50MW to T1 Energy, enabling advancement of existing industrial facility into a world-class data center","length":144,"tagName":"p"},{"type":"text","content":"AUSTIN, Texas and NEW YORK, March 18, 2026 (GLOBE NEWSWIRE) -- T1 Energy Inc. (NYSE: TE) (“T1,” “T1 Energy,” or the “Company”) today announced that Norway’s national grid operator, Statnett, has assigned 50MW of grid power to T1 Energy’s existing 926,000-square-foot industrial building in Mo i Rana. T1 remains in the interconnection queue for 396MW of power and is grateful the grid operator recognized the importance of this 50MW accelerated power allocation to an existing industrial site.","length":493,"tagName":"p"},{"type":"text","content":"“T1 is building a solar supply chain to deliver scalable, reliable, and low-cost energy in the United States. Our legacy assets in the Nordics could be developed as world-class data centers utilizing the region’s abundant low-cost power and human capital with a strong industrial heritage,” said Daniel Barcelo, T1 Energy’s Chairman and CEO.","length":341,"tagName":"p"},{"type":"text","content":"Pareto Securities has been engaged to maximize the shareholder value of the Mo i Rana facility for T1.","length":102,"tagName":"p"},{"type":"text","content":"The 50MW of N-0 power requires an uninterruptible power supply (UPS) and step-down transformer infrastructure to serve anticipated data center loads as early as Q2 2027. The temporary power allotment runs through the end of 2033.","length":229,"tagName":"p"},{"type":"text","content":"“Access to 50MW is a key step forward. It represents the first phase of a world-class data center development and accelerates our dialogue with parties seeking available, scalable, and secure European AI infrastructure,” said Andreas Bentzen, T1 Energy’s Chief Te...