Business

Surge Copper Resumes Drilling at Ootsa and Expands Drill Program

Surge Copper Resumes Drilling at Ootsa and Expands Drill Program Canada NewsWir...

articleSurge Copper Corp.January 11, 20214/company/surge-copper-corp/news/surge-copper-resumes-drilling-at-ootsa-and-expands-drill-program
Surge Copper Resumes Drilling at Ootsa and Expands Drill Program

About this update from Surge Copper Corp.

[{"type":"text","content":"\n \n \n \n Surge Copper Resumes Drilling at Ootsa and Expands Drill Program\n \n \n /* Style Definitions */\nspan.prnews_span\n{\nfont-size:8pt;\nfont-family:\"Arial\";\ncolor:black;\n}\na.prnews_a\n{\ncolor:blue;\n}\nli.prnews_li\n{\nfont-size:8pt;\nfont-family:\"Arial\";\ncolor:black;\n}\np.prnews_p\n{\nfont-size:0.62em;\nfont-family:\"Arial\";\ncolor:black;\nmargin:0in;\n}\n.prngen2{\nBORDER-TOP:black 0pt; BORDER-RIGHT:black 0pt; VERTICAL-ALIGN: TOP; BORDER-BOTTOM:black 0pt; TEXT-ALIGN: LEFT; PADDING-LEFT:0.50em; BORDER-LEFT:black 0pt; PADDING-RIGHT:0.50em\n}\n.prnpl6{\nPADDING-LEFT:0.50em\n}\n.prnpr6{\nPADDING-RIGHT:0.50em\n}\n.prnsblb0{\nBORDER-LEFT:black 0pt\n}\n.prnsbt0{\nBORDER-TOP:0pt\n}\n.prnvab{\nVERTICAL-ALIGN: BOTTOM\n}\n.prnrbrb0{\nBORDER-RIGHT:black 0pt\n}\n.prnbcc{\nBORDER-COLLAPSE: COLLAPSE\n}\n.prnsbl0{\nBORDER-LEFT:0pt\n}\n.prnsbtb0{\nBORDER-TOP:black 0pt\n}\n.prnsbb0{\nBORDER-BOTTOM:0pt\n}\n.prnsbr0{\nBORDER-RIGHT:0pt\n}\n \n \n \n \n \n \n Canada NewsWire\n \n \n \n \n \n VANCOUVER, BC\n \n ,\n \n Jan. 11, 2021\n \n /CNW/ - Surge Copper Corp. (TSXV: SURG) (\"Surge\" or the \"Company\") is pleased to announce that drilling has resumed at the Company's 100% owned Ootsa project in\n \n British Columbia\n \n after a planned holiday break, and a minimum 5,000 metres of additional drilling has been added to the winter program for a total of at least 15,000 metres. Surge remains well funded with approximately\n \n $6.3 million\n \n in the treasury.\n \n \n \n Highlights\n \n \n \n \n \n \n The current drill program at Ootsa has been expanded by a minimum of 5,000 metres, with additional drilling to focus on expanding resources at the West Seel deposit, where recent results from hole S20-219 delivered the longest continuously mineralized hole in the history of the Ootsa project, intersecting 0.42% CuEq\n \n 1\n \n over 1,013 metres from bedrock surface, ending in mineralization, and including 0.60% CuEq over 422 metres\n \n \n Assays are pending on six completed holes, plus the bottom portion of hole S20-218 which targeted a chargeability anomaly in the footwall of the East Fault adjacent to the East Seel deposit\n \n \n Permitting procedures initiated for access and infrastructure upgrade work on the Berg project in advance of Surge's maiden exploration program to commence later in 2021\n \n \n \n \n Leif Nilsson\...

More updates from Surge Copper Corp.