Business
Sun Summit Minerals Outlines Plans for 2025 Exploration Program at the JD Project, Toodoggone District, B.C.
Vancouver, British Columbia--(Newsfile Corp. - November 26, 2024) - Sun Summit Minerals Corp. (TS...

About this update from Sun Summit Minerals Corp.
[{"type":"text","content":"Sun Summit Minerals Outlines Plans for 2025 Exploration Program at the JD Project, Toodoggone District, B.C.Vancouver, British Columbia--(Newsfile Corp. - November 26, 2024) - Sun Summit Minerals Corp. (TSXV: SMN) (OTCQB: SMREF) is pleased to provide an overview of its upcoming 2025 project-wide exploration program at the JD Project, located in the Toodoggone Mining District, north-central British Columbia. The Company plans to fully evaluate the significant high-grade and bulk-tonnage gold potential at the Creek and Finn Zones through targeted and infill drilling. Project-wide exploration activities are also planned to advance multiple new and existing high-priority targets.Highlights:Finn Zone Targeted Drilling: Drilling at the Finn Zone will include confirmation, infill, and step-out holes designed to potentially contribute to a future mineral resource estimate. Holes will evaluate the near-surface high-grade gold potential of target. Historical intercepts highlights include:35.7 m of 7.26 g/t Au including 1 m of 215.4 g/t Au (JD95-0472)22.0 m of 12.5 g/t Au including 0.8 m of 171.5 g/t Au (JD95-0642)25.9 m of 6.42 g/t Au including 6.1 m of 12.8 g/t Au (JD94-0151)22.0 m of 6.32 g/t Au including 12.6 m of 10.8 g/t Au (JD12-0033)27.8 m of 6.64 g/t Au including 11.0 m of 15.1 g/t Au (JD95-0972)Creek Zone Step-Out and Infill Drilling: Drilling at the Creek Zone will include step-out and infill drilling designed to investigate the extent and continuity of high-grade and bulk-tonnage gold mineralization. Results may be used for a future mineral resource estimate. Historical and recent highlight intercepts include:122.53 m of 2.11 g/t Au including 1.5 of 121.0 g/t Au (CZ-24-0047)54.95 m of 2.69 g/t Au including 19.50 m of 7.31 g/t Au (CZ-24-0058)22.0 m of 11.7 g/t Au including 4.0 m of 61.2 g/t Au (CZ97-0085)21.5 m of 3.1 g/t Au including 3.0 m of 18.7 g/t Au (CZ98-0126)Testing Additional Priority Targets: Project-wide exploration will also focus on:Newly identified porphyry and epithermal targets including, Creek North, Belle North, and Fericrete targets. Established high-priority epithermal targets across the Finn to Creek Corridor including MVT, JD West, Ag Carbonate, Wolf and Schmitt.Geophysical and Geochemical Surveys: Additional Induced Polarization (IP) geophysical and soil geochemical surveys will be completed across multipl...