Business
Sun Summit Extends High-Grade Mineralization at Buck Project, B.C., Intersects 6.4 g/t Au and 27.6 g/t Ag over 7.0 Metres, Including 38.0 g/t Au and 137.0 g/t Ag over 1.1 Metres in Western Step Out Hole
Vancouver, British Columbia--(Newsfile Corp. - January 19, 2023) - Sun Summit Minerals Corp. (TSX...

About this update from Sun Summit Minerals Corp.
[{"type":"text","content":"Sun Summit Extends High-Grade Mineralization at Buck Project, B.C., Intersects 6.4 g/t Au and 27.6 g/t Ag over 7.0 Metres, Including 38.0 g/t Au and 137.0 g/t Ag over 1.1 Metres in Western Step Out HoleVancouver, British Columbia--(Newsfile Corp. - January 19, 2023) - Sun Summit Minerals Corp. (TSXV: SMN) (OTCQB: SMREF) is pleased to report drill results from the first five holes of its fall 2022 exploration drill program on its Buck Project, central B.C. The program consisted of 10 diamond drill holes totalling approximately 3,000 metres. The focus of the drill program was to test the extent of the Buck Main gold-silver-zinc epithermal-related system along strike and at depth. Analytical results from the first five expansion holes indicate the presence and continuity of gold-silver-zinc epithermal-related mineralization beyond the previously tested Buck Main mineralized system. Three of the westernmost holes intersected broad zones of strong gold-silver-zinc mineralization with numerous higher-grade intervals. Highlights from the first 5 holes include:Hole BK22-083:72.0 metres of 0.5 g/t Au and 10.0 g/t Ag,including 4.2 metres of 3.1 g/t Au and 53.8 g/t Ag;7.0 metres of 6.4 g/t Au and 27.6 g/t Ag,including 1.1 metres of 38.0 g/t Au and 137.0 g/t Ag.Hole BK22-082:37.3 metres of 0.7 g/t Au and 10.9 g/t Ag, including 1.5 metres of 11.8 g/t Au and 39.2 g/t Ag, before the hole was lost in bad ground.Hole BK22-081:27.0 metres of 0.4 g/t Au and 14.9 g/t Ag before the hole was lost in bad ground.Results demonstrate strong expansion potential for both disseminated and high-grade gold-silver-zinc mineralization to the west and to the south of previous drill programs.Notes:Intervals are downhole core lengths. True widths are unknown.Calculations are uncut and length-weighted using a 0.10 g/t gold cut-off.Actual values may slightly differ from Table 1 due to rounding.Sharyn Alexander, Sun Summit's President, stated: \"Our goal for the fall 2022 drill program at Buck Main was to investigate lithologic and structural controls on gold-silver-zinc mineralization as well as scale potential along strike, primarily to the west and south of where our previous drilling defined new zones of mineralization. Initial results from these five holes appear to support our objective and demonstrate the potential for expansion. With every new step out hole w...