Business

Stroud Resources Updates Drilling at Santo Domingo Silver Project, Mexico

TORONTO, Oct. 22, 2021 (GLOBE NEWSWIRE) -- Stroud Resources Ltd. (TSXV-SDR) (“Stroud” or the “Company”) is pleased to provide an update to its 2021 Phase 1 dril

articleStroud Resources Ltd.October 22, 20215/company/stroud-resources-ltd/news/stroud-resources-updates-drilling-at-santo-domingo-silver-project-mexico
Stroud Resources Updates Drilling at Santo Domingo Silver Project, Mexico

About this update from Stroud Resources Ltd.

[{"type":"text","content":" TORONTO, Oct. 22, 2021 (GLOBE NEWSWIRE) -- Stroud Resources Ltd. (TSXV-SDR) (“Stroud” or the “Company”) is pleased to provide an update to its 2021 Phase 1 drilling program at its Santo Domingo Silver Property (“Santo Domingo” or the “Property”), located in Hostotipaquillo, State of Jalisco, Mexico. To date, the Company has completed 5,725 metres in 14 diamond drill holes as part of its Phase 1 exploration drilling program (Table 1). The drilling program was designed to explore the extent of known vein-hosted silver mineralization on the Property and to begin to define additional silver mineralized zones and vein systems which are anticipated to run parallel to the existing La Raya and Guadalupe silver vein systems. The Company’s Drilling Permit covers 13 drill pads (drill setups) located across the Property and from which 50 diamond drill holes were planned. Drilling has been slow due to difficult topography, poor ground conditions, and COVID-19 related challenges. In addition, significant historical mine workings throughout the Property have also required slow and careful drilling. Five additional holes to those listed in Table 1 were abandoned after encountering mine workings and being unable to recover the hole (Figure 1). Table 1. Summary of drill holes completed to date, Phase 1 drilling program. Drill Hole East North Elevation Azimuth Dip Length (m) Hole Type Vein System Target SD-21-46 606383 2334194 1151 230 -50 309 Exploration Guadalupe SD-21-47 606383 2334194 1151 230 -65 350 Exploration Guadalupe SD-21-48 606383 2334194 1151 230 -80 375 Exploration Guadalupe SD-21-53 606540 2334185 1130 230 -55 384 Exploration Guadalupe SD-21-54 606540 2334185 1130 230 -65 324 Exploration Guadalupe SD-21-56 606540 2334185 1130 230 -85 293 Exploration Guadalupe SD-21-68A 606531 2334449 1039 230 -55 405 Exploration Guadalupe SD-21-71 606621 2334417 991 230 -50 297 Delineation La Raya SD-21-73 606540 2334185 1130 50 -65 423 Exploration La Raya HW SD-21-74 606440 2334207 1146 50 -65 403 Exploration La Raya HW SD-21-80 606058 2334180 1160 230 -50 534 Exploration Santa Fe/Santa Clara SD-21-81 606058 2334180 1160 230 -70 540 Exploration Santa Fe/Santa Clara SD-21-82 606058 2334180 1160 50 -65 537 Exploration Santa Fe/Santa Clara SD-21-84 606328 2334142 1166 230 -55 552 Exploration Santa Fe/Santa Clara Datum/Coordinate system: WGS 84 / UTM ...

More updates from Stroud Resources Ltd.