Business

StrikePoint Drills Near-Surface High Grade Oxide Gold at the Hercules Gold Project, Nevada, 32.04 Meters of 0.54 g/t Au and 4.62 g/t Ag Starting at Surface, Including 4.57 Meters of 1.14 g/t Au and 10.53 g/t Ag and an Additional 6.10m of 1.50 g/t Au and 11.75 g/t Ag

Vancouver, British Columbia--(Newsfile Corp. - April 28, 2025) - StrikePoint Gold Inc. (TSXV: SK...

articleStrikepoint Gold Inc.April 28, 20254/company/strikepoint-gold-inc/news/strikepoint-drills-near-surface-high-grade-oxide-gold-at-the-hercules-gold-project-nevada-3204-meters-of-054-gt-au-and-462-gt-ag-starting-at-surface-including-457-meters-of-114-gt-au-and-1053-gt-ag-and-an-additional-610m-of-150-gt-au-and-1175-gt-ag
StrikePoint Drills Near-Surface High Grade Oxide Gold at the Hercules Gold Project, Nevada, 32.04 Meters of 0.54 g/t Au and 4.62 g/t Ag Starting at Surface, Including 4.57 Meters of 1.14 g/t Au and 10.53 g/t Ag and an Additional 6.10m of 1.50 g/t Au and 11.75 g/t Ag

About this update from Strikepoint Gold Inc.

[{"type":"text","content":"StrikePoint Drills Near-Surface High Grade Oxide Gold at the Hercules Gold Project, Nevada, 32.04 Meters of 0.54 g/t Au and 4.62 g/t Ag Starting at Surface, Including 4.57 Meters of 1.14 g/t Au and 10.53 g/t Ag and an Additional 6.10m of 1.50 g/t Au and 11.75 g/t AgVancouver, British Columbia--(Newsfile Corp. - April 28, 2025) - StrikePoint Gold Inc. (TSXV: SKP) (OTCQB: STKXF) (\"StrikePoint\" or the \"Company\") is pleased to announce initial results from drilling that took place in the spring of 2025 on its Hercules Gold Project located in Nevada's prolific Walker Lane. The Company completed 7 drillholes totaling approximately 1,400 meters of reverse circulation drilling on the Hercules Gold Project. StrikePoint is reporting assay results from the first 4 drillholes of the program, with each drillhole returning near surface gold mineralization. The final 3 drillholes remain queued at the lab and expected to be received shortly.Hercules Gold Project April 28, 2025, Drill ResultsHole IDFrom (m)To (m)Length (m)Au (g/t)Ag (g/t)H250014.579.144.570.227.37and12.1841.1128.930.456.05incl.30.4536.546.091.0414.27and62.4280.6918.270.614.66incl.66.9973.086.091.3310.38H250020.0018.2918.290.301.68and89.92115.8225.910.552.73H250030.003.053.050.231.60and19.8125.916.100.432.28and30.4860.9630.480.373.57incl32.0035.053.050.974.50and73.1586.8713.720.252.37H250040.0032.0432.040.544.62incl0.004.574.571.1410.53and incl24.3830.486.101.5011.75and 103.63121.9218.290.303.12 Length reported above is sample length, there is insufficient data to estimate true thickness.Michael G. Allen, President and CEO of StrikePoint said, \"Results received so far show broad zones of near surface gold mineralization on the Hercules Gold Project. This is in line with our recently announced Exploration Target for the property. The near surface nature of the mineralization leads the Company to anticipate that Hercules could potentially be an open pit - heap leach type operation.\"For further information on the Exploration Target on the Hercules Gold Project refer to the Company's March 3, 2025 release. Figure 1: Hercules Gold Project 2025 Drill CollarsTo view an enhanced version of this graphic, please visit:https://images.newsfilecorp.com/files/5044/249922_a95998e664bf0ad6_001full.jpgHercules Gold Project April 28, 2025, Drill Hole InformationHoleIDAzInc.Hole Length (...

More updates from Strikepoint Gold Inc.