Business

Drilling to Commence at Angelina in Manitoba

Jul. 7, 2011 (Canada NewsWire Group) -- CALGARY, July 7, 2011 /CNW/ - StrikePoint Gold (TSXV:...

articleStrikepoint Gold Inc.July 7, 20114/company/strikepoint-gold-inc/news/drilling-to-commence-at-angelina-in-manitoba
Drilling to Commence at Angelina in Manitoba

About this update from Strikepoint Gold Inc.

[{"type":"text","content":"\n\n\n Jul. 7, 2011 (Canada NewsWire Group) -- \n\n#ReleaseContent TABLE\n{\n BORDER-COLLAPSE: collapse\n}\nTR.cnwUnderlinedCell TD\n{\n BORDER-BOTTOM: #000000 1px solid\n}\nTR.cnwDoubleUnderlinedCell TD\n{\n BORDER-BOTTOM: #000000 3px double\n}\nTR.cnwBoldUnderlinedCell TD\n{\n BORDER-BOTTOM: #000000 3px solid\n}\nTD.cnwUnderlinedCell\n{\n BORDER-BOTTOM: #000000 1px solid\n}\nTD.cnwDoubleUnderlinedCell\n{\n BORDER-BOTTOM: #000000 3px double\n}\nTD.cnwBoldUnderlinedCell\n{\n BORDER-BOTTOM: #000000 3px solid\n}\n#ReleaseContent TABLE.cnwBorderedTable TD\n{\n BORDER-RIGHT: black 1px solid;\n PADDING-RIGHT: 2px;\n BORDER-TOP: black 1px solid;\n PADDING-LEFT: 2px;\n PADDING-BOTTOM: 2px;\n BORDER-LEFT: black 1px solid;\n PADDING-TOP: 2px;\n BORDER-BOTTOM: black 1px solid;\n BORDER-COLLAPSE: collapse\n}\n#ReleaseContent TABLE TD\n{\n PADDING-RIGHT: 2px;\n PADDING-LEFT: 2px;\n PADDING-BOTTOM: 2px;\n PADDING-TOP: 2px\n}\n\n\n\n\nSKP: TSXV   \n\n\n \n\n\n \n\n\n \n\n\nSTKXF: OTCQX\n\n\n\n\nCALGARY, July 7, 2011 /CNW/ - StrikePoint Gold (TSXV: SKP) (OTCQX:\n STKXF) announces that it has scheduled a summer drill program to\n commence within two weeks on its 100% owned Angelina gold property\n located at the south-eastern end of the Rice Lake gold belt in\n Manitoba. Two crews are currently active on the property, conducting\n ground magnetic surveys and performing detailed mapping and drill site\n selection.\n\n\nThe area to be drilled, near Halfway Lake at the south end of the\n Angelina property was scheduled to be drilled last winter. However,\n unfavourable winter conditions did not allow for heavy equipment to be\n transported into the drill areas. Drilling was re-scheduled for the\n 2011-2012 winter season. Recently, the assessment of geological and\n surface grab sample analytical information, combined with geophysical\n data collected during the past three weeks has resulted in this area\n being elevated to a priority that justifies the cost associated with a\n summer helicopter and float plane supported drill program. A helicopter\n portable drill has been located and will be airlifted in to a\n structurally interesting target area where gold and silver bearing grab\n samples were collected during 2010 as described in our recent Press\n Release of June 23, 2011.\n\n\nAt the Angelina property which is virtually ...

More updates from Strikepoint Gold Inc.