Business

Starr Peak Reports Results of its Ongoing 2021 Drilling Campaign with Multiple VMS Intersects Up To 6.65% Zinc-Equivalent Over 13.45 Metres Including Copper Rich Sub Intersect of 3.83% Cu Over 2.25 Metres

Starr Peak Reports Results of its Ongoing 2021 Drilling Campaign with Multiple VMS Inters...

articleStarr Peak Mining LtdNovember 2, 20214/company/starr-peak-exploration-ltd/news/starr-peak-reports-results-of-its-ongoing-2021-drilling-campaign-with-multiple-vms-intersects-up-to-665percent-zinc-equivalent-over-1345-metres-including-copper-rich-sub-intersect-of-383percent-cu-over-225-metres
Starr Peak Reports Results of its Ongoing 2021 Drilling Campaign with Multiple VMS Intersects Up To 6.65% Zinc-Equivalent Over 13.45 Metres Including Copper Rich Sub Intersect of 3.83% Cu Over 2.25 Metres

About this update from Starr Peak Mining Ltd

[{"type":"text","content":"\n \n \n \n Starr Peak Reports Results of its Ongoing 2021 Drilling Campaign with Multiple VMS Intersects Up To 6.65% Zinc-Equivalent Over 13.45 Metres Including Copper Rich Sub Intersect of 3.83% Cu Over 2.25 Metres\n \n \n /* Style Definitions */\nspan.prnews_span\n{\nfont-size:8pt;\nfont-family:\"Arial\";\ncolor:black;\n}\na.prnews_a\n{\ncolor:blue;\n}\nli.prnews_li\n{\nfont-size:8pt;\nfont-family:\"Arial\";\ncolor:black;\n}\np.prnews_p\n{\nfont-size:0.62em;\nfont-family:\"Arial\";\ncolor:black;\nmargin:0in;\n}\n \n \n \n \n \n \n Canada NewsWire\n \n \n \n \n VANCOUVER, BC,\n \n Nov. 2, 2021\n \n /CNW/ -\n \n Starr Peak Mining Ltd. (\"Starr Peak\" or the \"Company\")\n \n (TSXV: STE) (OTC:STRPF) is very pleased to announce a number of drill results from its ongoing 2021 drilling campaign on its NewMétal property (\"\n \n NewMétal\n \n \" or \"\n \n the Property\n \n \"), located in the Abitibi Greenstone Belt of\n \n Quebec\n \n near the town of Normétal. The NewMétal project also includes the past-producing Normétal Mine, from which ~10.1M tonnes of 2.15% Cu, 5.12% Zn, 0.549 g/t Au, and 45.25 g/t Ag were produced (Boivin, 1988). Results are extending the Upper and Deep zones, located directly under Normetmar trend at depth. See below\n \n Table 1, Table 2\n \n and\n \n Figure 1\n \n showing up to date assay results and Zinc Equivalent (Zn_Eq) calculations of drill hole mineralized intervals.\n \n \n \n Highlights\n \n \n \n \n Upper Zone (above\n \n 400m\n \n vertically)\n \n \n \n STE-21-66:\n \n 13.45 m\n \n of 6.65 % ZnEq, incl. 3.83% Cu over\n \n 2.25m\n \n \n \n \n Deep Zone (below\n \n 400m\n \n vertically)\n \n \n \n STE-21-59-W3:\n \n 10.1 m\n \n of 6.16 % ZnEq\n \n \n \n \n \n Johnathan More\n \n , Chairman and CEO of\n \n Starr Peak\n \n commented, \"The two Zones are delivering high copper mineralization zonation which is as expected in polymetallic VMS deposits. The Deep Zone and related targets at depth will add to our understanding of this mineralized system as it is open for extensions in several directions. We are also very excited by the just initiated exploration program along the Normétal-Normetmar lithological contact.\"\n \n \n \n Table 1 – Deep zone\n \n \n \n \n \n \n \n \n \n \n \n Intervals are reported as drill core lengths measured downhole. True widt...

More updates from Starr Peak Mining Ltd